WARD LOCATION QTY COST ESTIMATE<br />

16 Kurhula 2 Struct. R320,000.00<br />

Sub – total R320,000.00<br />

GRAND TOTAL R3,930,000.00<br />

The Municipality requires about four million rand (R3, 930,000.00) to address identified stormwater control<br />

and culverts challenges identified. Lack of proper stormwater control and culverts affect the socio-<br />

economic life of the municipality during rainy seasons. Amongst the services sacrificed during rainy seasons<br />

is schooling and hence the education of the municipal area.<br />

The follow table presents municipal roads, per location that need to be re-graveled<br />

Table B.47: Municipal roads per location that need upgrading<br />

WARD LOCATION QTY COST ESTIMATE<br />

1 Makhushane - Haniville 2km R4,000,000.00<br />

Sub - total R4,000,000.00<br />

2 Selwane 3km R6,000,000.00<br />

Sub –total R6,000,000.00<br />

3 Namakgale Zone A & D 4km R8, 000,000.00<br />

Sub – total R8, 000,000.00<br />

4 Matiko-Xikaya 2km R4,000,000.00<br />

5 -<br />

Humulani 2km R4,000,000.00<br />

Sub - total R8,000,000.00<br />

6 Lulekani – Far East 2km R4,000,000.00<br />

Sub – total R4, 000,000.00<br />

124