05.05.2013 Views

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WARD LOCATION QTY COAST ESTIMATE<br />

Maseke - Boelang 60m 2<br />

R8,400.00<br />

Sub – total R16,800.00<br />

11 Makhushane – Main Road 120m 2<br />

R16,800.00<br />

Sub-total R16,800.00<br />

12 Namakgale Zone A&D 150m 2<br />

R21,000.00<br />

Sub – total R21,000.00<br />

13 Namakgale Zone B&C 150m 2<br />

R21,000.00<br />

Sub – total R21,000.00<br />

14 Namakgale Zone B 180m 2<br />

Majeje 20m 2<br />

R25,200.00<br />

R2,800.00<br />

Sub – total R28,000.00<br />

15 Mashishimale - Maune 40m 2<br />

R5,600.00<br />

Sub – total R5,600.00<br />

16 - - -<br />

GRAND TOTAL 3,490m 2 R488,600.00<br />

Public Transport<br />

The table below presents modes of transport in the municipal area.<br />

Table B.49: Percentage population utilizing different modes of transport<br />

Mode of Transport Number utilizing transport mode % Utilizing the<br />

Transport Mode<br />

Foot/bicycle 45 577 34.7%<br />

Private 12 527 9.5%<br />

Bus 6 144 4.7%<br />

129

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!