temporary jobs were created against the target of 200 permanent and 750 temporary. % outstanding<br />

service debtors did not reach the target of 50%.<br />

With regard to SDBIP and LSDBIP performance, Corporate Services Directorate and the Office of the<br />

municipal manager exceeded targets in all the four quarters, whereas the rest of the directorates only<br />

managed to reach their performance targets.<br />

Interventions on priority needs per ward:<br />

An analysis of the extent of municipal interventions on ward priorities revealed the following:<br />

Ward Priority Need % Intervention<br />

1 Water, sanitation, electricity 60%<br />

2 Water, bridge and culverts, job creation, clinics 40%<br />

3 Streets, cemetery, residential sites, job creation 40%<br />

4 Electrification, water, transport/roads,<br />

formalization of settlements<br />

5 Sewerage, water, electricity, refuse removal, road<br />

maintenance<br />

6 Cemetery, electrification, culverts, speeds humps,<br />

new sites<br />

7 Street lights, roads, new sites, recreational<br />

facilities, storm water<br />

60%<br />

100%<br />

40%<br />

8 Water, roads, cemetery, library 40%<br />

9 Roads, water, bridge, cemetery 20%<br />

10 Water, electrification, roads, houses, culverts 80%<br />

0%<br />