05.05.2013 Views

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Name Project Location Description Implementing Budget<br />

areas<br />

Educational Infrastructure<br />

Two crèche buildings Locations to be identified ECD Support to LMS MDM -<br />

D8. Sector Departments<br />

Project Name Project Location Project Description Implementing<br />

Agent<br />

Seloane (Pty) LTD Seloane Drip Irrigation for<br />

10ha<br />

Mponeng, Tipfuxeni<br />

eggs<br />

Miami plot no. &<br />

Itekeng Batub<br />

Overall<br />

Budget<br />

Land Reform Programme<br />

Phalaborwa Broiler LDA 97 032<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

LDA 595000 - - 595000<br />

Implementing Period & Budget<br />

2012-<br />

2013<br />

2013-<br />

2014<br />

2014-<br />

2015<br />

277<br />

2015-<br />

2016

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!