05.05.2013 Views

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C6: Ba-Phalaborwa Local Municipality Turnaround Strategy<br />

No.<br />

Priority Turn Around<br />

Focal Area<br />

1. Basic Service Delivery<br />

1.1 Access to water<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

1. Infrequent supply of<br />

water at: Gravelotte<br />

& all villages (11)<br />

2. Aged infrastructure<br />

(asbestos pipes) and<br />

no refurbishment<br />

plan for PHB,<br />

Lulekani &<br />

Namakgale<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

1. Functional<br />

Boreholes at<br />

Selwane,<br />

Mashishimale,<br />

Gravelotte<br />

2. Section of<br />

pipeline<br />

replaced on<br />

every financial<br />

Municipal<br />

Action<br />

1. Monitor the<br />

functionalit<br />

y of the<br />

boreholes<br />

2. PHB<br />

refurbished<br />

reticulation<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

1. MDM (WSA)to<br />

equip the<br />

boreholes<br />

2. MDM (WSA)<br />

must provide<br />

budget for<br />

rehabilitation<br />

45<br />

Human<br />

Resource<br />

allocated<br />

(-24 DWAE)<br />

218<br />

Budget<br />

Allocated Projected<br />

1. MDM<br />

2. MDM<br />

&<br />

BPM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!