05.05.2013 Views

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Key Issues with regard to Waste Management<br />

• Ageing infrastructure.<br />

• Inadequate staffing.<br />

• Land claims in the Phalaborwa dumping site.<br />

• Licensing of new landfill site.<br />

• Rehabilitation and closing of Namakgale, Lulekani and Phalaborwa landfill sites.<br />

Waste Management Recycling<br />

The Municipality is able to recycle 20% of its waste in the Phalaborwa dumping site. The percentage as it is<br />

currently is very low. The challenge with recycle is the distance from Phalaborwa to Gauteng where waste<br />

recycle materials are sold and the lack of transport thereof.<br />

Other recycling in the Municipality is done by private companies in the Phalaborwa Industrial area. They<br />

receive most of their recyclables from the local mines and industrial factories. Sorting of recyclables is done<br />

in the yard as well as outside the yard.<br />

B5.5 Housing<br />

Ba-Phalaborwa Municipality is not a housing authority. The table below presents an overview of the<br />

housing situation in the municipal area over the years.<br />

Table B.42: Housing delivery, 2002/03 to 2007/08<br />

Year Allocation Delivery % Delivered<br />

2002/03 800 486 60.75<br />

2003/04 720 682 94.72<br />

2004/05 561 161 28.7<br />

2005/06 385 385 100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!