05.05.2013 Views

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

No.<br />

Priority Turn Around<br />

Focal Area<br />

5. Local Economic Development<br />

5.1 Municipal contribution to<br />

LED<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

Plans to formalise the<br />

Marula industry in place<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

Complete &<br />

operationalize the<br />

Marula Extraction<br />

Hub & consolidation<br />

of Marula Women<br />

cooperatives<br />

(MWCs)<br />

Municipal<br />

Action<br />

operational risks<br />

1. Fast-track the<br />

construction<br />

of the Marula<br />

Oil Extraction<br />

Hub<br />

2. Outline the<br />

business<br />

process and<br />

plant design<br />

to<br />

manufacture<br />

other<br />

products on<br />

the Marula<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

4. Completion of<br />

Marula Product<br />

Strategy<br />

including<br />

consolidation<br />

of the Marula<br />

Value Chain<br />

studies by<br />

LEDET<br />

5. Training of<br />

MWCs into<br />

Marula byproduct<br />

manufacturing<br />

Human<br />

Resource<br />

allocated<br />

4 R8 m<br />

231<br />

Budget<br />

Allocated Projected

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!