Key Issues with regard to water and sanitation:<br />

Ba-Phalaborwa Municipality is not a water services authority;<br />

The current water backlog requires about R34 million to correct, up to RDP level;<br />

R80 million is required to correct the backlog to yard connection status;<br />

Management of Nondweni Augmentation Scheme is a challenge;<br />

The distribution infrastructure is more than 35 years old;<br />

Supply to Phalaborwa town is operating at full capacity (25,6Ml/d);<br />

There is unbalanced water distribution caused by over utilization in unmetred areas as well as<br />

system capacity;<br />

There is over consumption (About 10MI/d due to non-metering, loss of income is estimated at<br />

R30 000 per day);<br />

Loss of income due to non-payment is about 5Ml/d or R15 000 per day;<br />

Service below RDP standard is at 23%;<br />

Communities that rely on boreholes complain about boreholes that are not working;<br />

Daily water supply interruptions are common in more that 75% of the wards;<br />

Some households in Wards 2, 11, and 16 still have to travel more than 200m to access water;<br />

Two Clinics, one in Ward 9 and the other in Ward 11 do not have piped water;<br />

Two schools in Ward 8 and one in Ward 12 do not have toilets;<br />

Delays in the approval of technical reports by DWA; and<br />

Cost recovery and the non-payment of services.<br />

Management supply problems affect water in the Selwane/Nondweni Water Scheme.<br />

Sanitation infrastructure in Phalaborwa Town needs to be upgraded in order to accommodate<br />

new developments<br />

B5.3 Electricity/Energy<br />

The National Electricity Regulator has licensed the Municipality to supply electricity within the<br />

boundaries of the old Phalaborwa area. ESKOM is the license holder within the Municipality for all<br />

the out-laying areas, which includes Namakgale, Lulekani, and all the villages such as Makhushane,<br />

Selwane, Nondweni, etc.<br />