05.05.2013 Views

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Proposed Priority Projects<br />

Following from the above information, the proposed priority housing projects for Ba-Phalaborwa<br />

Municipality can be summarised as follows:<br />

• Matiko-Xikaya<br />

• Ben Farm<br />

• Lulekani A<br />

• Selwane<br />

• Maseke<br />

• Mashishimale<br />

• Makhushane<br />

• Phalaborwa<br />

The current housing backlog of 1925 can be easily addressed within the areas of town, Lulekani,<br />

Namakgale, Mashishimale and Makhusane area. This number is very minimal, and can be addressed in less<br />

than the stipulated five years.<br />

Remarks<br />

Apart from some prevalent institutional problems, the Ba-Phalaborwa Municipality has a clear and well-<br />

directed vision as to how it will meet the existing and projected future housing demand in its area of<br />

jurisdiction. The housing strategy caters for public and private housing, and projects are aimed at<br />

consolidating the urban structure, optimising the utilisation of existing infrastructure, and enhancing the<br />

sustainability of the livelihoods of all of its residents.<br />

298

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!