20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

132 <strong>MFG</strong>/<strong>PRO</strong> USER GUIDE — MANUFACTURING<br />

If operation 40 was closed for a quantity of 85 units, the system closes<br />

operation 30 for a quantity of 85, and operations 10 and 20 for a quantity<br />

of 90.<br />

Note Work Order Accounting Close (16.21) closes open operations<br />

using the same logic.<br />

Closed operations do not contribute to the projected load for a work<br />

center.<br />

Generating Reports<br />

Shop floor control reports display data based on the following:<br />

• Transactions<br />

• Downtime<br />

• Input and output<br />

• Utilization and efficiency<br />

Transactions<br />

Operation<br />

Previously<br />

Completed Completed<br />

30 0 75<br />

40 0 75<br />

50 0 75<br />

Operation<br />

Previously<br />

Completed Completed<br />

10 0 90<br />

20 90 90<br />

30 0 85<br />

40 85 85<br />

50 0 75<br />

Transactions are created when you record labor feedback, nonproductive<br />

labor, downtime, and operation <strong>com</strong>pletions. You can review these<br />

transactions by work center, work order, or employee.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!