230 <strong>MFG</strong>/<strong>PRO</strong> USER GUIDE — MANUFACTURING<br />

Ï See Chapter 12,<br />

“Material<br />

Requirements<br />

Planning,” on<br />

page 239.<br />

Computer-Assisted Master Scheduling<br />

By defining time fences for master scheduled items, you can let MRP<br />

control orders outside of a specified time period and allow the master<br />

scheduler to control orders within that time period. To use this approach<br />

to master scheduling, in the Time Fence field in Item Master Maintenance<br />

(1.4.1) or Item Planning Maintenance (1.4.7), specify a planning horizon,<br />

in calendar days, for each master scheduled item. When MRP plans<br />

orders for these items, it will not schedule order due dates within this time<br />

fence.<br />

Note The time fence for an item should generally be equal to the<br />

cumulative lead time for that item.<br />

To use the <strong>com</strong>puter-assisted approach for master scheduling, set the<br />

following values for each master scheduled item in Item Master<br />

Maintenance (1.4.1) or Item Planning Maintenance (1.4.7).<br />

Master Schedule. Yes.<br />

Plan Orders. No.<br />

Order Policy. Any option other than blank.<br />

Time Fence. The cumulative item lead time.<br />

Selective Materials Plan<br />

Selective Materials Plan (23.3) lets you plan master scheduled items<br />

separately from MRP items. If you use the <strong>com</strong>puter-assisted approach to<br />

master scheduling, you may want to run Selective Materials Plan as<br />

follows.<br />

1 Run Selective Materials Plan for master schedule items only.<br />

2 Adjust the master schedule and rerun Selective Materials Plan as<br />

needed.<br />

3 Run Selective Materials Plan for MRP-scheduled items only.