20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

272 <strong>MFG</strong>/<strong>PRO</strong> USER GUIDE — MANUFACTURING<br />

Labor Feedback by Work Order 126<br />

test results 201<br />

lead times 246<br />

changing 40<br />

<strong>com</strong>posite 22<br />

co-products/by-products 73<br />

cumulative 22<br />

manufacturing 40<br />

move 38<br />

operation 38<br />

queue 37<br />

run 38<br />

scheduling production lines 151<br />

setup 37<br />

subcontract 38<br />

wait 38<br />

Line Allocation Inquiry 143<br />

Line Allocation Maintenance 143<br />

Line Changeover Maintenance 145<br />

Line Schedule Maintenance<br />

co-products/by-products 87<br />

Line Schedule Workbench 149<br />

deleting sequence records 152<br />

lead times 151<br />

multiples 150<br />

production quantities 151<br />

sequence numbers 150<br />

Line Utilization Report 152<br />

lines<br />

production 142<br />

load reporting 261<br />

Lot Actual Bill Inquiry<br />

co-products/by-products 85<br />

lot control<br />

co-products/by-products 85<br />

Lot Where-Used Inquiry<br />

co-products/by-products 85<br />

Low Level Code Update 251<br />

M<br />

manufacturing<br />

lead time 37, 40<br />

yield 41<br />

master<br />

specifications 194<br />

master production scheduling (MPS) 228–237<br />

available-to-promise (ATP) 231<br />

<strong>com</strong>puter-assisted scheduling 230<br />

creating schedule 228<br />

fully automatic 229<br />

fully manual scheduling 229<br />

items for 228, 243<br />

master schedule orders 234<br />

MRP use of 240<br />

multilevel 232<br />

multilevel scheduling techniques 233<br />

planning bills 232<br />

production forecast 233<br />

repetitive schedules 234<br />

seasonality 235<br />

Master Schedule Detail Inquiry 237<br />

Master Schedule Detail Report 237<br />

Master Schedule Order Maintenance 93, 229, 234<br />

Master Specification Maintenance 194<br />

material requirements planning (MRP) 239–256<br />

action messages 253<br />

by-products 74<br />

co-products/by-products 59, 74<br />

action messages 76<br />

base processes 74, 75<br />

co-products 74, 77<br />

planned order reports 77<br />

planned work orders 76<br />

summary reports 77<br />

demand 240<br />

demand sources 241<br />

forecasting 222<br />

item planning data 243<br />

items not seen by 248<br />

lead times and 246<br />

Line Schedule Workbench 151<br />

multiple base processes 74<br />

output 253<br />

past due forecasts 227<br />

pegged requirements 251<br />

repetitive explosion 155<br />

scrap factor in 18<br />

shop calendar 255<br />

substitute items 21<br />

supply 240<br />

supply sources 241<br />

yield 41<br />

messages<br />

advanced repetitive warnings 166<br />

MRP action 253<br />

method change variance (MCV) 168<br />

milestones<br />

operations 33, 147<br />

mix variance accounts<br />

co-products/by-products 57, 81<br />

modifying<br />

work order bill 106<br />

work order routings 107<br />

work orders 106

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!