20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

268 <strong>MFG</strong>/<strong>PRO</strong> USER GUIDE — MANUFACTURING<br />

alternate 64<br />

alternate routings 64<br />

BOM/Formula codes 54<br />

planning for 55<br />

restricting inventory transactions 58<br />

setting up item 58<br />

batch<br />

formula quantity type 46<br />

quantities 17<br />

size for formula 46<br />

work orders 99<br />

bills of material. See product structures<br />

BOM codes 14<br />

as parent items 14<br />

co-products/by-products 59<br />

linking to items 15<br />

BOM. See product structures<br />

burden 31<br />

by-products<br />

costs 67<br />

definition 53<br />

lead times 73<br />

Material requirements planning (MRP) 74<br />

recyclable 62<br />

setting up items for 59<br />

C<br />

calculating<br />

forecasts 214<br />

picklists 156<br />

Calendar Maintenance<br />

work center calendar 27<br />

calendars<br />

shop<br />

MRP use of 255<br />

work center 27<br />

capacity<br />

adjusting 263<br />

department 258<br />

operation 33<br />

shift 144<br />

work center 31, 258<br />

capacity requirements planning (CRP) 257–263<br />

adjusting capacity 263<br />

adjusting load 263<br />

defining capacities 258<br />

department labor capacity 28<br />

lead times 37<br />

load reports 261<br />

operation capacity 33<br />

scheduling operations 259<br />

work center capacity 31<br />

Certificate of Analysis Print 204<br />

changeover times 145<br />

closed work orders 101<br />

closing<br />

cumulative orders 162<br />

Co/By-Product Maintenance 66, 80, 83<br />

Co/By-Product Work Order Inquiry 81<br />

Co/By-Products Cost Report 69, 74<br />

Compliance Control File<br />

co-products/by-products 65, 84<br />

<strong>com</strong>posite lead times 22<br />

configured products<br />

product structures for 18<br />

consume earliest open 138<br />

consume forecast<br />

forecasting 225<br />

control file<br />

MRP 242<br />

Work Order 92<br />

co-products/by-products 51–87<br />

average costs 69<br />

accounting for 72<br />

allocation methods 70<br />

backflush 82<br />

method 60<br />

base processes<br />

alternate routings 64<br />

BOM/Formula codes 54<br />

defined 54<br />

defining alternate 64<br />

defining co-products for 60<br />

item status codes 58<br />

lead times 73<br />

material requirements planning (MRP) 74, 75<br />

planning for 55<br />

planning for multiple 74<br />

restricting inventory transactions 58<br />

setting up items for 58<br />

WO status codes 79<br />

BOM/Formula codes 59<br />

by-products<br />

costs 67<br />

defined 53<br />

freezing costs 67<br />

lead times 73<br />

Material requirements planning (MRP) 74<br />

setting up items for 59<br />

co/by-product structures 60<br />

co-products<br />

alternate base processes 55<br />

average costs 69<br />

cost allocation percentages 61, 66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!