20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

36 <strong>MFG</strong>/<strong>PRO</strong> USER GUIDE — MANUFACTURING<br />

Ï See “Automatic<br />

Labor Reporting”<br />

on page 147 for<br />

details.<br />

Purchase Order, Line. If this operation is for subcontract services,<br />

enter the number of a scheduled purchase order and a corresponding<br />

line number. Schedule Update from MRP (5.5.3.1) uses this<br />

information when supplier schedules are generated for subcontract<br />

service suppliers. This value is also used by repetitive subcontract<br />

processing.<br />

Move Next Op. Enter Yes or Not to determine the default for the same<br />

field in Backflush Transaction (18.22.13) and the Move Transaction<br />

(18.22.19).<br />

Auto Labor Report. This field is used in the Advanced Repetitive<br />

module to determine if standard labor is reported automatically by the<br />

Backflush Transaction (18.22.13).<br />

Alternate Routings<br />

After you have entered a routing, you can link it to an item in several<br />

ways, depending on whether it should be used as the default routing code<br />

or available for use as an alternate routing.<br />

• If the routing should be the default for an item, update the routing<br />

code in Item Planning Maintenance (1.4.7). This is the routing code<br />

used for MRP, work orders, repetitive, and costing.<br />

• If the routing should be the default for an item at a particular site,<br />

update the routing code using Item-Site Planning Maintenance<br />

(1.4.17). This is the routing code used for MRP, work orders,<br />

repetitive, and costing for an item at a site. It overrides the routing<br />

code set up in Item Planning Maintenance.<br />

• If the routing should be available as an alternate for an item at any<br />

site but not used as the default, use Alternate Routing Maintenance<br />

(14.15.1) to link it with an item. This allows the routing code on a<br />

work order to be changed to this alternate routing.<br />

• If the routing should be available as an alternate for an item at a<br />

specific site, use Alternate Routing Maintenance to link a routing<br />

code to an item-site. This allows the routing code on a work order<br />

to be changed to this alternate routing.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!