20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Formula Maintenance 45<br />

co-products/by-products 63<br />

lead time offset 109<br />

work order 102<br />

formulas 43–47<br />

batch size 46<br />

batch type 46<br />

co-product/by-product 47<br />

copying 47<br />

defining 45<br />

defining BOM/Formula code 46<br />

MRP use of 248<br />

setup for 44<br />

used for multiple items 14<br />

freezing costs<br />

by-products 67<br />

G<br />

general ledger (GL)<br />

period end 122<br />

H<br />

horizon<br />

forecasting 207<br />

horizontal pattern 210<br />

I<br />

Input/Output Inquiry 261<br />

Input/Output Report 133, 261<br />

Integrate with SA field<br />

effect on forecasting 208<br />

inventory audits 202<br />

Inventory Control File<br />

picking logic 107<br />

work order 109<br />

Inventory Detail Report<br />

auditing items 203<br />

inventory sampling 197<br />

Issues–Unplanned<br />

floor stock 20<br />

issuing<br />

work order <strong>com</strong>ponents 110<br />

Item Cost Maintenance<br />

co-products/by-products 68<br />

Item Master Maintenance 154<br />

base process item 58<br />

co-products/by-products 59, 68<br />

planning parameters 243<br />

Item Planning Maintenance<br />

BOM code 14<br />

co-products/by-products 59<br />

MRP use of 243<br />

phantoms 16<br />

Pur/Mfg code 97<br />

routing code 36<br />

Item Specification Maintenance 195<br />

Item Status Code Maintenance 58<br />

co-products/by-products 58<br />

Item Substitution Maintenance 21<br />

co-products/by-products 65, 84<br />

items<br />

expensed 20<br />

key 108<br />

master scheduled 228, 243<br />

planning parameters 243<br />

specifications for 195<br />

Item-Site Cost Maintenance<br />

co-products/by-products 68<br />

Item-Site Planning Maintenance 154<br />

BOM code 14<br />

co-products/by-products 58, 59<br />

MRP use of 243<br />

phantoms 16<br />

routing code 36<br />

J<br />

joint order sets 78<br />

printing 81<br />

releasing 81<br />

reviewing 81<br />

K<br />

key items<br />

work orders 108<br />

L<br />

labor 31<br />

advanced repetitive transactions 171<br />

backflushing automatically 147<br />

nonproductive 130<br />

reporting feedback 126<br />

reports 132<br />

down time 133<br />

input/output 133<br />

transactions 132<br />

utilization and efficiency 133<br />

labor feedback<br />

departments 127<br />

employees 126<br />

item quantities 127<br />

test results 201<br />

work centers 127<br />

Labor Feedback by Employee 126<br />

Labor Feedback by Work Center 126<br />

INDEX 271

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!