20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

58 <strong>MFG</strong>/<strong>PRO</strong> USER GUIDE — MANUFACTURING<br />

Tip<br />

Item status codes<br />

are created and<br />

maintained in Item<br />

Status Code<br />

Maintenance<br />

(1.1.5).<br />

Setting Up Work Centers<br />

A work center is a production facility capable of performing a certain<br />

task. A work center might be a place, a machine or group of machines, a<br />

person or group of people. In <strong>MFG</strong>/<strong>PRO</strong>, work centers are the most basic<br />

units used for operation scheduling, capacity requirements planning, and<br />

cost determinations for GL transactions.<br />

In Work Center Maintenance (14.5), set up work centers by entering for<br />

each a unique work center code and a unique machine code.<br />

Setting Up Product Lines<br />

A product line is a group of similar items or products. At many<br />

<strong>com</strong>panies, sales and operations are planned, reported, and analyzed by<br />

product line rather than by individual item or product. To establish a<br />

product line, use Product Line Maintenance (1.2.1).<br />

Setting Up Item Status Codes for the Base Process<br />

Base process items are never stocked in inventory. As a result, although<br />

base processes are entered as regular items, they are not processed as<br />

inventory items. Use item status codes to prevent any inventory<br />

transactions related to base process items. Only two transactions should<br />

be allowed for the base item:<br />

• ADD-PS, which occurs when the item is added to a product structure.<br />

• ADD-WO, which occurs when the item is added to a work order.<br />

Setting Up an Item for the Base Process<br />

1 Create a base process item in Item Master Maintenance (1.4.1). Enter<br />

the unit of measure for each batch. Assign an item status that restricts<br />

inventory transactions.<br />

2 Enter the following information in the Item Planning Data frame.<br />

Batch Qty. This is established in Formula Code Maintenance (15.1) or<br />

Process/Formula Maintenance (15.18).<br />

Plan Orders. Enter Yes.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!