20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

142 <strong>MFG</strong>/<strong>PRO</strong> USER GUIDE — MANUFACTURING<br />

Fig. 8.2<br />

Example of End Eff<br />

Days Use<br />

Fig. 8.3<br />

Production Line<br />

Maintenance<br />

(18.22.1.1)<br />

Ï See “Setting Up<br />

Line Allocations”<br />

on page 143.<br />

End effective<br />

date of last<br />

cumulative order<br />

Start effective<br />

date of next<br />

cumulative order<br />

June 1994<br />

June 1994<br />

Setting Up Production Lines<br />

Sun Mon Tue Wed Thu Fri Sat<br />

2 3 4<br />

5 6 7 8 9 10 11<br />

12 13 14 15 16 17 18<br />

19 20 21 22 23 24 25<br />

26 27 28 29 30<br />

A production line is defined at a site by specifying the hourly production<br />

rate for items produced on that line during a normal shift. One or more<br />

items can be made on the same production line, and the same item can be<br />

produced on several production lines, all at the same or at different<br />

production rates.<br />

When an item is produced on one line only, this line can be assigned a<br />

primary line status for that item. A primary line produces all orders for an<br />

item. To indicate a primary line, set the Primary Line field to Yes.<br />

Optionally, orders for an item can be allocated to several different<br />

1<br />

Start effective<br />

date of<br />

cumulative order<br />

End effective<br />

date of<br />

cumulative order<br />