20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(Supplier) Schedule Update from MRP (5.5.3.1). A supplier schedule<br />

cannot be updated with an MRP-planned order for a co-product or<br />

base process from a joint order set.<br />

Repetitive<br />

The Repetitive module does not support joint schedules like the Work<br />

Orders module supports joint order sets.<br />

Line Schedule Maintenance (18.1.10). The line schedule<br />

(workbench) can be updated using normal MRP-planned orders for an<br />

item on a production line, but not using MRP-planned orders for a<br />

co-product or base process from a joint order set.<br />

Repetitive Schedule Maintenance (18.3) and Repetitive Schedule<br />

Explosion (18.6). A repetitive schedule can be entered for a<br />

co-product, but the schedule that is exploded from it does not include<br />

the other co-products and/or by-products for its base process.<br />

Similarly, a repetitive schedule can be entered for a base process, but<br />

the schedule that is exploded from it does not include co-products or<br />

by-products.<br />

CO-<strong>PRO</strong>DUCTS/BY-<strong>PRO</strong>DUCTS 87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!