252 <strong>MFG</strong>/<strong>PRO</strong> USER GUIDE — MANUFACTURING<br />

Tip<br />

Typically, Net<br />

Change MRP is run<br />

daily.<br />

Tip<br />

The first time you<br />

run MRP, it should<br />

be regenerative.<br />

Net Change Materials Plan<br />

Net Change Materials Plan (23.1) calculates demand and plans supply<br />

only for items that have changed since MRP was last run. These changes<br />

could involve any of the following:<br />

• Item or item-site planning data<br />

• Product structures<br />

• Sales or purchase orders<br />

• Work orders or repetitive schedules<br />

• Inventory<br />

• Forecasts<br />

• Master production schedule<br />

• Intersite demand<br />

In addition to planning items that have changed, net change MRP<br />

recalculates lower-level requirements for items planned.<br />

Both net change and regenerative MRP plan items based on low-level<br />

codes. They determine requirements at the top level first, then continue<br />

down through the item structure, one level at a time.<br />

Regenerative MRP<br />

Regenerate Materials Plan (23.2) recalculates demand and plans supply<br />

for all items in the site. The outputs of net change and regenerative MRP<br />

are the same. However, net change MRP generally runs faster than<br />

regenerative, since it only plans for items that changed since MRP was<br />

last run.<br />

You should always schedule periodic regenerative MRP runs, even if you<br />

primarily use net change MRP, since net change MRP does not consider<br />

demand or forecast for items entering the MRP horizon over time.<br />

Selective Materials Plan<br />

Selective Materials Plan (23.3) plans only for items and sites you select. It<br />

can be run in net change mode by setting the Required Items Only field to<br />

Yes, or in regenerative mode by setting Required Items Only to No.