20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

production lines. To set up multiple production lines for an item, set the<br />

Primary Line field to No and use Line Allocation Maintenance<br />

(18.22.1.11) to set the percent of an item’s production for each line.<br />

The production rate for an item on a production line is equal to that of the<br />

operation with the lowest production rate. A production line is no faster<br />

than its slowest operation.<br />

Production rates can vary by shift or day. You can adjust the basic<br />

production rate for an item by changing the rate factor in the Productivity<br />

field in Shift Maintenance (18.22.1.22).<br />

Use the effective date associated with the production rate to indicate<br />

changes in a line when items are phased in or out of production or when<br />

rates increase or decrease at a certain date.<br />

Setting Up Line Allocations<br />

Within a supply site, items can be produced on one or more production<br />

lines. The line allocation specifies how production is distributed among<br />

multiple lines.<br />

To set up production line allocations, use Line Allocation Maintenance<br />

(18.22.1.11). Set up line allocations for items that can be produced on<br />

multiple production lines within a site. The line percentages must total<br />

100%.<br />

Use Line Allocation Inquiry (18.22.1.12) to view line allocations by site<br />

and item number.<br />

ADVANCED REPETITIVE 143<br />

Fig. 8.4<br />

Line Allocation<br />

Maintenance<br />

(18.22.1.11)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!