20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

182 <strong>MFG</strong>/<strong>PRO</strong> USER GUIDE — MANUFACTURING<br />

<strong>com</strong>ponents tagged to that operation, and closes out the subcontract<br />

operation for the quantity. The appropriate GL transactions are generated<br />

to the transaction history file and the operation history file.<br />

Alternately, receive the purchase order using Purchase Order Receipts<br />

(5.13.1). This creates the same GL transactions and backflushes the<br />

<strong>com</strong>ponents. With this approach, the purchase order does not need to be a<br />

scheduled order. You can create it using Purchase Order Maintenance<br />

(5.7) as a type S (subcontract operation) order.<br />

Be aware of some restrictions when using these programs.<br />

• The system attempts to backflush all possible <strong>com</strong>ponents. However,<br />

lot or serial-controlled items must be backflushed separately using<br />

Backflush Transaction.<br />

• You cannot modify the <strong>com</strong>ponent backflush list as you can in<br />

Backflush Transaction.<br />

• If the subcontract operation is the last operation in a routing, the items<br />

are not transferred from the output queue to Finished Material<br />

inventory. Use Move Transaction for that task.<br />

• These programs do not post subcontract usage variance. That is<br />

posted by Post Accumulated Usage Variances.<br />

The system automatically locates the active cumulative order if the<br />

cumulative order recorded on the purchase order is expired. To locate the<br />

active cumulative order, it uses the item, site, operation, line, routing, and<br />

product structure code of the cumulative order in the PO detail record,<br />

along with the effective date of the transaction.<br />

Therefore, receiving dock personnel do not have to enter the cumulative<br />

order ID and operation, as long as there is only one line, routing, and<br />

product structure code for the site and item being received against.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!