20.06.2013 Views

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

MFG/PRO 9.0 User Guide Volume 3: Manufacturing - QAD.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

270 <strong>MFG</strong>/<strong>PRO</strong> USER GUIDE — MANUFACTURING<br />

cyclical pattern 210<br />

D<br />

date<br />

work order 103<br />

delete/archive<br />

forecast detail 223<br />

quality orders 200<br />

work orders 123<br />

demand patterns<br />

sales history 210<br />

Department Maintenance 29<br />

departments<br />

account codes 28<br />

accounts 28<br />

capacity 258<br />

labor capacity 28<br />

labor feedback by 127<br />

work center 28<br />

destructive testing 204<br />

Detail Forecast Delete/Archive 223<br />

Detail Forecast Maintenance 215<br />

modifying results 215<br />

dispatching work orders 120<br />

Down Time by Reason Report<br />

shop floor control 131<br />

Down Time Report 131<br />

Down Time Transaction 171<br />

downtime 129<br />

due dates<br />

work order 103<br />

E<br />

effective dates<br />

product structures 18<br />

efficiency 133<br />

employee 127<br />

Employee Maintenance 127<br />

labor rate 127<br />

employees<br />

efficiency 127<br />

labor feedback 126<br />

End Eff Days field 142<br />

engineering change orders 23<br />

engineering effectivity 23<br />

expense<br />

work orders 96<br />

expensed items 20<br />

exploded work orders 100<br />

explosion<br />

advanced repetitive schedules 154<br />

F<br />

FAS. See final assembly (FAS)<br />

feature codes<br />

configured product 18<br />

final assembly (FAS)<br />

work orders 96<br />

firm planned work orders 99<br />

first article inspections 203<br />

fixed order quantity (FOQ) 244<br />

floor stock 20<br />

expensed items vs 20<br />

FOQ (Fixed Order Quantity) 244<br />

Forecast Maintenance 224<br />

Forecast Worksheet Maintenance 224<br />

forecasting 205–228<br />

adding methods 213<br />

alpha factor 212<br />

calculating forecasts 214<br />

<strong>com</strong>bining criteria templates 219<br />

consumption 225<br />

forward and backward 226<br />

copying<br />

criteria templates 219<br />

forecasts 217<br />

results 219<br />

creating detail records 214<br />

creating forecasts 206<br />

creating forecasts manually 215<br />

criteria templates 208, 214<br />

detail records<br />

loading into summary forecast file 222<br />

loading methods 223<br />

horizon 207<br />

material requirements planning (MRP) 222<br />

methods 211<br />

best fit 211<br />

classic de<strong>com</strong>position 212<br />

creating custom 213<br />

double exponential smoothing 211<br />

double moving average 211<br />

simple regression 212<br />

Winter’s linear exponential smoothing 211<br />

modifying results 215<br />

multiplicative factors 217<br />

net forecast calculation 226<br />

new items 220<br />

rolling forecasts 207<br />

simulations 207<br />

single items 220<br />

summary forecast file 222<br />

Formula Code Maintenance 14, 46<br />

Formula Copy 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!