REQUEST FOR PROPOSALS RFP NUMBER: 0A1031 DATE ISSUED
REQUEST FOR PROPOSALS RFP NUMBER: 0A1031 DATE ISSUED
REQUEST FOR PROPOSALS RFP NUMBER: 0A1031 DATE ISSUED
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SUPPLEMENT SEVENTEEN<br />
Consumables Replenishment Process<br />
1. ODPS will provide the Contractor a report that shows the average DL/ID sales for each<br />
agency over the last 12 month period. The Contractor is responsible for maintaining a 120<br />
day (4-month) supply of consumables required for operation based upon estimated usage for<br />
each CSC and DR location.<br />
2. On or about the 4 th Tuesday of each month, all DRs call or e-mail the Consignment Inventory<br />
Section and provide the current inventory level for all consumables for their respective office.<br />
3. The Consignment Inventory Section sends the current inventory level for each CSC and DR<br />
location to the Contractor. The Contractor is responsible for determining replenishment<br />
needs based upon the difference in the required inventory level and the current inventory<br />
level.<br />
4. The Contractor shall have all replenishment orders ready to ship within the first two (2) ODPS<br />
business days of each month.<br />
5. The Contractor must perform Quality Assurance and Quality Control standards to ensure<br />
consumables shipped are accurate<br />
6. Replenishment orders must be completely shipped and received by the CSC and DR office<br />
within the first five (5) business days of each month.<br />
A. If defective consumables are discovered at the agencies, a call is placed to the DTS help<br />
desk.<br />
B. The DTS help desk will report the defective consumables to the Contractors help desk.<br />
1. If the potentially defective consumables have resulted in the CSC or DR to be nonoperable:<br />
a. The Contractors help desk must dispatch a technician to the agency to review the<br />
consumable in question. The technician must have a supply of good<br />
consumables to replace the consumables in question to minimize down-time.<br />
1. If cards are found to be defective a “Field Failure Form” will be filled out and<br />
faxed via e-fax to the Contractor to have the cards replaced. The e-fax will<br />
also be sent to Field Operations for review.<br />
2. If any other consumable is found to be defective the Contractor must replace<br />
the consumable with non-defective consumables to ensure continuity of<br />
operations.<br />
2. If the potentially defective consumables have not resulted in the CSC or DR to be<br />
non-operable, the defective consumables will be handled on a case by case basis.<br />
a. The Contractor may dispatch a technician to review and replace the consumable<br />
in question and an e-fax will be sent to the Contractor and Field Operations; or<br />
b. Send replacement consumables to the CSC or DR location. A return call tags will<br />
be issued by the Contractor to the respective agency to have the defective<br />
consumable returned.<br />
7. Field Operations shall have access to view the Contractors web based ticketing system. The<br />
system shall note all current open and closed calls placed with the Contractor’s help desk.