during which the DL/ID solution performs at an effectiveness level of 99.5% uptime at per<br />
location.<br />
5. Demonstrates problem-free interfaces to the ODPS system applications BASS DL/ID issuing<br />
software.<br />
6. Produces acceptable DL/ID cards that meet the specified security and durability criteria.<br />
E. The Contractor must, in order to pass the Beta/Pilot Test Period, demonstrate its ability to provide<br />
the required service and maintenance of the DL/ID solution throughout the entire Beta/Pilot Test<br />
Period.<br />
F. In order to pass the Beta/Pilot Test Period, any and all equipment provided pursuant to this <strong>RFP</strong><br />
(including all addenda and any resulting Contract), and the DL/ID solution as a whole, must, to<br />
the satisfaction of the ODPS, conform to all specifications published or provided by the<br />
Contractor or manufacturer, including but not limited to, issued DL/ID physical characteristics,<br />
operating characteristics, space requirements, power requirements, and maintenance.<br />
G. In order to pass the Beta/Pilot Test Period, any and all software drivers, including, but not limited<br />
to any customizations thereto, shall, to the satisfaction of the ODPS, conform to all specifications<br />
published or provided by the Contractor or developer in all respects, including, but not limited to,<br />
operating performance and interfacing with the ODPS system applications.<br />
H. If the DL/ID solution does not meet or sustain performance at an effectiveness level of 99.5%<br />
uptime per location per week and meet all of the other criteria set forth in this <strong>RFP</strong>, during the 30<br />
consecutive calendar days of the Beta/Pilot Test Period, the Beta/Pilot Test Period may continue<br />
at ODPS’ sole discretion, on a day-to-day basis until the DL/ID solution, in ODPS’ sole judgment,<br />
meets all such criteria for 30 consecutive calendar days, or less at ODPS’ option.<br />
System Testing and Acceptance Period – Final System Acceptance<br />
Once the Beta/Pilot Test Period is declared successful in writing by the ODPS, system training and<br />
system installations shall commence at the remaining sites as determined and scheduled by the<br />
ODPS in preparation for Final System Acceptance. The Contractor must conduct an operational site<br />
systems test and review after each site is installed and certified ready for production implementation.<br />
A. Once the remaining sites are declared ready for production implementation by the Contractor and<br />
the ODPS in writing, Final System Acceptance will begin. Final System Acceptance must be a<br />
statewide production monitoring period where the Contractor must successfully demonstrate all<br />
requirements of this <strong>RFP</strong> (including all addenda and any resulting Contract) for 30 consecutive<br />
calendar days, or less at ODPS’ option.<br />
B. In order to pass Final System Acceptance testing, the Contactor must successfully demonstrate<br />
that the DL/ID solution meets all requirements of this <strong>RFP</strong> (including all addenda and any<br />
resulting Contract) and performs all functions at an effectiveness level of 99.5% uptime per<br />
location per week, for 30 consecutive calendar days, while operating statewide in full production<br />
mode.<br />
C. Final System Acceptance monitoring must include, but not be limited to monitoring to confirm, to<br />
the satisfaction of the ODPS, that the DL/ID solution:<br />
1. Performs successfully in accordance with all the mandatory requirements specified in this<br />
<strong>RFP</strong> (including all addenda and any resulting Contract).<br />
2. Continues to perform successfully in accordance with all manufacturer’s and Contractor’s<br />
technical specifications and user specifications; the ODPS reserves the right to conduct<br />