• Maintain a site log that details the hardware and software driver configurations for each site.<br />

The site-log will be the property of the State, and one copy will be left on-site with the CSC or<br />

DR or their designee and another copy will be sent to the ODPS point of contact.<br />

• Apply asset ownership tags with the Contractor’s name to each hardware component and log<br />

all asset information into a Microsoft Excel spreadsheet prior to the physical installation and<br />

provide the electronic version and a paper version within fifteen (15) calendar days after the<br />

installation is complete. Asset ownership tags on equipment must be uniformly placed. All of<br />

the following information must be recorded and provided to the ODPS BMV: Model Number,<br />

Serial Number, Asset Description, Location, and Asset ID Number. These site logs will be the<br />

property of the State. One copy will be left on-site with the CSC and DR or their designee and<br />

one copy will be sent to the ODPS BMV.<br />

• Remove and dispose from the CSC and DR offices all packing, boxes, etc. used in the<br />

shipping and installation of the hardware and software driver involved in this Project.<br />

• Leave the office in a clean and neat state after installation is complete, and before the<br />

Contractor’s work is accepted. Cabling must be neat, labeled and orderly.<br />

• The Contractor must agree to provide expedited delivery service, if necessary, to maintain<br />

the implementation schedule or to replace defective equipment at no additional cost.<br />

• In the event of a change in the location of an existing CSC or DR location, the Contractor<br />

shall be required to uninstall, reinstall, and test the DL/ID solution in the new location.<br />

• The State reserves the right to move the hardware acquired under the Contract.<br />

• The Contractor’s installation times and schedule must be finalized and approved by the<br />

ODPS in accordance with the Installation Sequence provided in Supplement Nineteen.<br />

Production installation will occur after normal business hours. Final installation times will be<br />

finalized after the successful completion of the Beta Testing. The Contractor must provide onsite<br />

support for a minimum of three hours the first morning of operating the new system.<br />

Work Hours and Conditions. Alpha and Beta/Pilot Testing activities and planning and status meetings<br />

that involve State staff will occur during normal working hours on State property Monday through Friday,<br />

8:00 AM to 5:00 PM. The Contractor must provide a Project Manager that must work at the ODPS<br />

Shipley building to manage the Project and serve as the primary communicator between the Contractor’s<br />

staff and the ODPS staff for the entire statewide Project through final ODPS acceptance.<br />

Supplement Four provides a listing of the CSC and DR office locations and hours of operation. The<br />

Contractor must schedule installation and training to occur after the DR office scheduled hours of<br />

operation.<br />

PART TWO: SPECIAL PROVISIONS<br />

Submittal of Deliverables. The Contractor must perform its tasks in a timely and professional manner<br />

that produces Deliverables that fully meet the Contract’s requirements. And the Contractor must provide<br />

the Deliverables no later than the due dates the Contract requires. At the time of delivery of a written<br />

Deliverable, the Contractor must submit an original and one copy of each Deliverable, plus an electronic<br />

copy. The Contractor must provide the electronic copy in a file format acceptable to the State.<br />

By submitting a Deliverable, the Contractor represents that, to the best of its knowledge, it has performed<br />

the associated tasks in a manner that meets the Contract’s requirements.<br />