REQUEST FOR PROPOSALS RFP NUMBER: 0A1031 DATE ISSUED
REQUEST FOR PROPOSALS RFP NUMBER: 0A1031 DATE ISSUED
REQUEST FOR PROPOSALS RFP NUMBER: 0A1031 DATE ISSUED
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Counter Camera Mounting Base: The camera will be fastened to a mounting bracket which is<br />
permanently anchored to the countertop. The mounting bracket is adjustable from 16 inches to 27<br />
inches and has a tiltable camera mount attached to the top with a standard camera mounting screw<br />
to fasten the camera securely.<br />
Signature Capture Solution. The offeror’s proposed solution must use Motorola Symbol PD8750<br />
Signature Pad as specified in Supplement Twenty.<br />
Signature Capture Solution Quantity. A total of two hundred thirty-two (232) new Signature Capture<br />
Solutions will to be a part of the proposed solution. The two (2) CSC, two hundred sixteen (216) DR<br />
locations and the DTS, Alpha Test Environment, and IT will each have one (1) new signature pad in<br />
operation. Ten Signature Capture Solutions are required for the inventory bank.<br />
In the event the quantity of inventory signature pads must be replenished and the model approved is<br />
no longer available, the replacement signature pad must be approved by ODPS before issuance to<br />
any DR.<br />
Signature Capture Solution Capabilities. The signature capture solution submitted for the<br />
proposal must transmit a bitmap file (.bmp) with the following characteristics:<br />
Width: 320 pixels<br />
Height: 100 pixels<br />
Horizontal resolution: 96 dpi<br />
Vertical resolution: 96 dpi<br />
Bit depth: 1<br />
Any proprietary software development kit (SDK) that is required to use the signature capture solution<br />
must be included as part of the proposal.<br />
System Testing and Acceptance Period<br />
A. The system acceptance period must consist of the following stages:<br />
1. Alpha Test Period: Full system integration testing, prior to production implementation, at the<br />
ODPS Headquarters test site (lab setting).<br />
2. Beta/Pilot Test Period: DL/ID system deployed and monitored in a production environment at 5<br />
initial sites.<br />
3. Final System Acceptance: Final acceptance review and monitoring after all DL/ID systems are<br />
fully operational statewide.<br />
B. Unless otherwise specified by the ODPS:<br />
1. The requirements of this <strong>RFP</strong> must be completed and the Alpha Test Period must begin within 45<br />
calendar days after receipt of order (ARO) and will last a minimum of 45 calendar days.<br />
2. The Beta/Pilot Test period will commence the day after the alpha testing is deemed successful<br />
and will last a minimum of 30 calendar days.<br />
3. Final System Acceptance will commence after the last statewide installation.<br />
If the Contractor fails to meet any of the <strong>RFP</strong> requirements, the State may require a replacement<br />
of the DL/ID solution or any solution component (to be provided by the Contractor) and/or may<br />
avail itself of the other remedies available in this Contract. If a replacement is requested by the<br />
ODPS, such replacement shall be with new equipment of comparable or greater quality and shall<br />
Page 45 of 115