03.08.2013 Views

REQUEST FOR PROPOSALS RFP NUMBER: 0A1031 DATE ISSUED

REQUEST FOR PROPOSALS RFP NUMBER: 0A1031 DATE ISSUED

REQUEST FOR PROPOSALS RFP NUMBER: 0A1031 DATE ISSUED

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

new equipment by the Contractor at no charge to the ODPS in order to<br />

restore services and bring the system to an operational state.<br />

8. Preventive Maintenance. The Contractor shall provide the necessary preventive<br />

maintenance, required testing and inspection, calibration, and other work necessary to<br />

maintain the equipment in good working order and complete operational condition for the<br />

duration of the Contract and the subsequent transition period.<br />

Preventive maintenance work must be scheduled to minimize impact to normal business<br />

operations at each location. Preventive maintenance must be performed at a time<br />

mutually agreed to by the ODPS and the Contractor.<br />

The preventative maintenance will minimally occur once per year and in accordance with<br />

OEM maintenance specifications. At this time, the Contractor’s personnel will provide<br />

preventative maintenance on all Contractor supplied equipment (i.e. printers, cameras,<br />

flash, signature pads, etc.) and a quality control check on consumables in inventory.<br />

The Contractor must perform a quality control check on each shipment, prior to leaving<br />

the warehouse, to verify the consumables shipped are the correct items and not<br />

defective.<br />

Principal Period of Maintenance. Maintenance must be accomplished within the Principal Period of<br />

Maintenance hours which are from 7:00 a.m. to 8:00 p.m., Monday through Saturday, excluding State<br />

Holidays. The Contractor’s maintenance department will schedule the preplanned maintenance with<br />

the DR. Maintenance on an emergency basis may be scheduled with the DR to be performed after<br />

hours weekdays and Saturday.<br />

Single Point of Notification. The Contractor shall provide a single point of notification and backup<br />

contact for all maintenance during the hours of the Principal Period of Maintenance. The Contractor<br />

shall provide a toll free telephone number and an e-mail address for the purpose of contacting the<br />

Contractor’s designated call center or help center.<br />

The Contractor’s Fee Structure. The Contract award will be for a not-to-exceed fixed price, payable on<br />

a price per transaction basis.<br />

Payment to the Contractor shall not commence until the Alpha testing and the Beta testing have both<br />

been completed successfully. The payment shall be based on the number of correct DL/ID Cards issued<br />

to the public per transaction fee. Public Safety shall be invoiced at the end of each month. A twenty-five<br />

percent (25%) payment hold back of the monthly billing amount submitted by the Contractor shall be<br />

retained by Public Safety until the Final System Acceptance requirements are met.<br />

Public Safety reserves the right to hold all payments, due the Contractor, if the 99.5% uptime per location<br />

per week performance level is not met statewide or more than two (2) remedial maintenance visits, for a<br />

DR, for the same problem occur during thirty (30) calendar day period.<br />

Reimbursable Expenses. None<br />

Bill to Address.<br />

ODPS<br />

ATTN: Fiscal Services<br />

PO Box 16520<br />

Columbus, OH 43216-6520<br />

Page 60 of 115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!