04.08.2013 Views

Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL

Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL

Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SPECIAL CONDITIONS OF CONTRACT<br />

Section – 5<br />

<strong>Annual</strong> <strong>Rate</strong> <strong>Contract</strong> <strong>for</strong> assistance services, operational support services ,<br />

Technical Maintenance services, , and emergency /shutdown services <strong>for</strong> the<br />

maintenance bases under the administrative control of <strong>NCR</strong>, O&M<br />

1. GENERAL:<br />

1.1. Special conditions of contract shall be read in conjunction with the general<br />

conditions of contract, specifications of work, drawings and any other document<br />

<strong>for</strong>ming part of this contract wherever the context so requires.<br />

1.2. Notwithstanding the sub-division of the document into these separate sections<br />

and volumes, every part of each shall be deemed to be supplementary of every<br />

other part and shall be read with and into the contract so far as it may be<br />

practicable to do so.<br />

1.3. Where any portion of the general condition of contract is repugnant to or<br />

at variance with any provisions of the special conditions of contract, then unless a<br />

different intention appears, the provision(s) of the special conditions of contract<br />

shall be deemed to override the provision(s) of general conditions of contract only<br />

to the extent that such repugnancies of variations in the special conditions of<br />

contract as are not possible of being reconciled with the provisions of general<br />

conditions of contract.<br />

1.4. Where, it is mentioned in the specification that the contractor shall per<strong>for</strong>m<br />

certain work <strong>for</strong> completing the job in totality or provide certain facilities, it is<br />

understood that the contractor shall do so at his own cost and the contract price<br />

shall be deemed to have included cost of such per<strong>for</strong>mances and provisions, so<br />

mentioned.<br />

1.5. The intending tenderer shall be deemed to have visited the site and gone through<br />

the GCC. Non familiarity with site conditions and unawareness of GCC shall in no<br />

way be considered a reason <strong>for</strong> any extra claim or <strong>for</strong> not carrying out the work in<br />

strict con<strong>for</strong>mity with the drawings, specifications or provisions of contract.<br />

1.6. If the quantities of any item(s) change to any extent due to any reason whatsoever,<br />

the contractor shall be bound to execute them at the rates quoted by him. The<br />

tender inviting authority also reserves the right to split the work in full or in part<br />

without assigning any reason thereof. The decision of Engineer-in-charge shall be<br />

final and binding on the contractor in this regard.<br />

1.7. The work executed shall be to the satisfaction of Engineer In-Charge/ OWNER and<br />

contract rates shall include any Incidental and Contingent works charges so as to<br />

compete the work in all respect in prompt, efficient and workman like manner.<br />

1.8. The contractor shall provide the requisite transport arrangement <strong>for</strong> his Engineer<br />

/staff <strong>for</strong> the contract work.<br />

100<br />

Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />

ARC <strong>for</strong> O&M <strong>Services</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!