5.6 The rates are "all inclusive". These rates include but are not limited to all costs and<br />

allowances, taxes, fringe benefits, protective and/or special clothing, construction<br />

supplies required <strong>for</strong> work of a nature included in this contract, overhead,<br />

profit, insurance, transportation and travel time.<br />

5.7 The rates are inclusive of providing hand tools, machinery such as welding machine,<br />

grinding machine, gas/welding cutting set and consumables such as fuel,<br />

lubricants, electrodes, filler wire, gases, grinding wheels where the concerned<br />

category of echnical Manpower is expected to use in execution of the job but<br />

exclusive of all major equipment and machinery like cranes.<br />

5.8 The normal time rates shall apply <strong>for</strong> all hours worked upto EIGHT (8) hours in a<br />

day including Sunday and Public holiday and separate rates shall apply <strong>for</strong> all<br />

the hours worked in excess of EIHT(8) hours in one day as per SOR. The<br />

payment <strong>for</strong> part of the day shall be made on pro-rata basis.<br />

5.9 The quoted rates shall be on actual working at site as per clause no. 5.8 above and<br />

excluding the time <strong>for</strong> mobilization and transportation of man & machinery to<br />

site. No other payment shall be made <strong>for</strong> mobilization and transportation charges of<br />

man & machinery to site / any taxes or duties/ Fuel / any other consumables.<br />

The Lump Sump hourly Rental charges should include all cost components.<br />

5.10 The arrangement of state entry permits like FORM 31, FORM 38 Inward , FORM 38<br />

Outward ,FORM 71 etc shall be in the scope of the contractor/ Agency.<br />

5.11 The above mentioned services are required <strong>for</strong> emergency/ shutdown jobs and<br />

hence can be operated at any time during the day on any week days (including<br />

Saturday, Sunday, Holidays).<br />

5.12 The above gives only the general scope of work, however, tenderer is supposed to<br />

acquaint himself of the various items as detailed in the SOR and also deemed<br />

to have visited the site and fully assessed the nature of work, site conditions,<br />

availability of storage space <strong>for</strong> materials, work areas available <strong>for</strong> construction,<br />

disposal/ stacking of surplus materials etc. and to acquint himself with the general<br />

nature of the site and its other features likely to affect his tender and the<br />

construction of works be<strong>for</strong>e quoting rates. No claim/ extension of time what-soever<br />

shall be entertained on account of prevailing site conditions.<br />

Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />

ARC <strong>for</strong> O&M <strong>Services</strong><br />

98