The CONTRACTOR shall provide assistance, instruments, labour and materials as are normally<br />

required <strong>for</strong> examining, measuring and testing any workmanship as may be selected and<br />

required by the ENGINEER-IN-CHARGE.<br />

74.2 All the tests that will be necessary in connection with the execution of the WORK as decided<br />

by the ENGINEER- IN-CHARGE shall be carried out at the field testing laboratory of the<br />

EMPLOYER by paying the charges as decided by the EMPLOYER from time to time. In case of<br />

non- availability of testing facility with the EMPLOYER, the required test shall be carried out at<br />

the cost of CONTRACTOR at Government or any other testing laboratory as directed by<br />

ENGINEER-IN-CHARGE.<br />

74.3 If any tests are required to be carried out in conjunction with the WORK or materials or<br />

workmanship not supplied by the CONTRACTOR, such tests shall be carried out by the<br />

CONTRACTOR as per instructions of ENGINEER-IN-CHARGE and cost of such tests shall be<br />

reimbursed by the EMPLOYER.<br />

75 Samples <strong>for</strong> approval:<br />

75.1 The CONTRACTOR shall furnish to the ENGINEER-IN-CHARGE <strong>for</strong> approval, when requested<br />

or if required by the specifications, adequate samples of all materials and finished to be used<br />

in the WORK. Such samples shall be submitted be<strong>for</strong>e the WORK is commenced and in ample<br />

time to permit tests and examinations thereof. All materials furnished and finishes applied in<br />

actual WORK shall be fully equal to the approved samples.<br />

76 Action and compensation in case of bad work:<br />

76.1 If it shall appear to the ENGINEER-IN-CHARGE that any work has been executed with<br />

unsound, imperfect or unskilled workmanship, or with materials of any inferior description, or<br />

that any materials or articles provided by the CONTRACTOR <strong>for</strong> the execution of the WORK<br />

are unsound, or of a quality inferior to that contracted <strong>for</strong>, or otherwise not in accordance<br />

with the CONTRACT, the CONTRACTOR shall on demand in writing from the ENGINEER-IN-<br />

CHARGE or his authorised representative specifying the WORK, materials or articles<br />

complained of notwithstanding that the same may have been inadvertently passed, certified<br />

and paid <strong>for</strong>, <strong>for</strong>thwith rectify or remove and reconstruct the WORK so specified and provide<br />

other proper and suitable materials or articles at his own cost and in the event of failure to do<br />

so within the period specified by the ENGINEER-IN-CHARGE in his demand a<strong>for</strong>esaid, the<br />

CONTRACTOR shall be liable to pay compensation at the rate of 1 % (One percent) of the<br />

estimated cost of the whole WORK, <strong>for</strong> every week limited to a maximum of 10% (ten<br />

percent) of the value of the whole WORK, while his failure to do so shall continue and in the<br />

case of any such failure the ENGINEER-IN-CHARGE may on expiry of notice period rectify or<br />

remove and re-execute the WORK or remove and replaced with others, the materials or<br />

articles complained of to as the case may be at the risk and expense in all respects of the<br />

CONTRACTOR. The decision of the Engineering-in-charge as to any question arising under<br />

this clause shall be final and conclusive.<br />

77 Suspension of works:<br />

77.1 i) Subject to the provisions of sub-para (ii) of this clause, the CONTRACTOR shall, if ordered<br />

in writing by the ENGINEER-IN-CHARGE, or his representative, temporarily suspend the<br />

WORKS or any part thereof <strong>for</strong> such written order, proceed with the WORK therein ordered to<br />

be suspended until, he shall have received a written order to proceed therewith. The<br />

CONTRACTOR shall not be entitled to claim compensation <strong>for</strong> any loss or damage sustained<br />

by him by reason of temporary suspension of the WORKS a<strong>for</strong>esaid. An extension of time <strong>for</strong><br />

completion, corresponding with the delay caused by any such suspension of the WORKS as<br />

Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />

ARC <strong>for</strong> O&M <strong>Services</strong><br />