24 <strong>Contract</strong> Per<strong>for</strong>mance Security:<br />

24.1 The CONTRACTOR shall furnish to the EMPLOYER, within 15 days from the date of<br />

notification of award, a security in the sum of 10% of the accepted value of the tender or the<br />

actual value of work to be done whichever is applicable due to any additional work or any<br />

other reasons, in the <strong>for</strong>m of a Bank draft/Banker’s cheque or Bank Guarantee or irrevocable<br />

Letter of credit (as per pro<strong>for</strong>ma enclosed) as <strong>Contract</strong> Per<strong>for</strong>mance Security with the<br />

EMPLOYER which will be refunded after the expiry of DEFECTS LIABILITY PERIOD.<br />

24.2 CONTRACTOR can furnish the <strong>Contract</strong> Per<strong>for</strong>mance Security in the <strong>for</strong>m of Demand Draft or<br />

through a Bank Guarantee or through an irrevocable Letter of Credit from any Indian<br />

scheduled bank or a branch of an International bank situated in India and registered with<br />

Reserve Bank of India as scheduled <strong>for</strong>eign bank. However, other than the Nationalised<br />

Indian Banks, the banks whose BGs are furnished, must be commercial banks having net<br />

worth in excess of Rs. 100 crores and a declaration to this effect should be made by such<br />

commercial bank either in the bank guarantee itself or separately on a letter head. The bank<br />

guarantee or the Letter of Credit shall be submitted in the prescribed <strong>for</strong>mat.<br />

24.3 If the CONTRACTOR/SUB-CONTRACTOR or their employees or the CONTRACTOR’s agents<br />

and representatives shall damage, break, deface or destroy any property belonging to the<br />

EMPLOYER or others during the execution of the CONTRACT, the same shall be made good<br />

by the CONTRACTOR at his own expenses and in default thereof, the ENGINEER-IN-CHARGE<br />

may cause the same to be made good by other agencies and recover expenses from the<br />

CONTRACTOR (<strong>for</strong> which the certificate of the ENGINEER- IN-CHARGE shall be final).<br />

24.4 All compensation or other sums of money payable by the CONTRACTOR to the EMPLOYER<br />

under terms of this CONTRACT may be deducted from or paid by the encashment or sale of a<br />

sufficient part of his <strong>Contract</strong> Per<strong>for</strong>mance Security or from any sums which may be due or<br />

may become due to the CONTRACTOR by the EMPLOYER of any account whatsoever and in<br />

the event of his <strong>Contract</strong> Per<strong>for</strong>mance Security being reduced by reasons of any such<br />

deductions or sale of a<strong>for</strong>esaid, the CONTRACTOR shall within ten days thereafter make good<br />

in cash, bank drafts as a<strong>for</strong>esaid any sum or sums which may have been deducted from or<br />

realised by sale of his <strong>Contract</strong> Per<strong>for</strong>mance Security, or any part thereof. No interest shall be<br />

payable by the EMPLOYER <strong>for</strong> sum deposited as <strong>Contract</strong> Per<strong>for</strong>mance Security. 24.5 Failure<br />

of the successful bidder to comply with the requirements of this Clause shall constitute<br />

sufficient grounds <strong>for</strong> the annulment of the award and the <strong>for</strong>feiture of bid security.<br />

25 Time of Per<strong>for</strong>mance:<br />

25.1 Time <strong>for</strong> Mobilisation The work covered by this CONTRACT shall be commenced within fifteen<br />

(15) days, the date of letter/Fax of Intent and be completed in stages on or be<strong>for</strong>e the dates<br />

as mentioned in the TIME SCHEDULE OF COMPLETION OF WORK. The CONTRACTOR should<br />

bear in mind that time is the essence of this agreement. Request <strong>for</strong> revision of construction<br />

time after tenders are opened will not receive consideration. The above period of fifteen (15)<br />

days is included within the overall COMPLETION SCHEDULE, not over and above the<br />

completion time to any additional work or any other reasons.<br />

25.2 Time Schedule of Construction:<br />

25.2.1 The general Time Schedule of construction is given in the TENDER DOCUMENT.<br />

CONTRACTOR should prepare a detailed monthly or weekly construction program jointly with<br />

the ENGINEER-IN-CHARGE within 15 days of receipt of LETTER/FAX OF INTENT or<br />

ACCEPTANCE OF TENDER. The WORK shall be executed strictly as per the Time Schedule<br />

given in the CONTRACT DOCUMENT. The period of construction given includes the time<br />

44<br />

Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />

ARC <strong>for</strong> O&M <strong>Services</strong>