and <strong>for</strong> the purpose a<strong>for</strong>esaid to use or authorise the use of any materials, temporary<br />
work, CONSTRUCTION PLANT, and stock as a<strong>for</strong>esaid, without making payment or<br />
allowance to the CONTRACTOR <strong>for</strong> the said materials other than such as may be<br />
certified in writing by the ENGINEER-IN-CHARGE to be reasonable, and without<br />
making any payment or allowance to the CONTRACTOR <strong>for</strong> the use of the temporary<br />
said works, construction plant and stock or being liable <strong>for</strong> any loss or damage<br />
thereto, and if the EMPLOYER shall by reason of his taking possession of the WORK<br />
or of the WORK being completed by other CONTRACTOR (due account being taken of<br />
any such extra work or works which may or be omitted) then the amount of such<br />
excess as certified by the ENGINEER-IN- CHARGE shall be deducted from any money<br />
which may be due <strong>for</strong> work done by the CONTRACTOR under the CONTRACT and not<br />
paid <strong>for</strong>. Any deficiency shall <strong>for</strong>thwith be made good and paid to the EMPLOYER by<br />
the CONTRACTOR and the EMPLOYER shall have power to sell in such manner and<br />
<strong>for</strong> such price as he may think fit all or any of the construction plant, materials etc.<br />
constructed by or belonging to and to recoup and retain the said deficiency or any<br />
part thereof out of proceeds of the sale.<br />
39 <strong>Contract</strong>or's responsibility with the mechanical, electrical, intercommunication system,<br />
airconditioning contractors and other agencies:<br />
39.1 Without repugnance of any other condition, it shall be the responsibility of the CONTRACTOR<br />
executing the work of civil construction, to work in close cooperation and coordinate the<br />
WORK with the Mechanical, Electrical, Air-conditioning and Intercommunication <strong>Contract</strong>or's<br />
and other agencies or their authorised representatives, in providing the necessary grooves,<br />
recesses, cuts and opening etc., in wall, slabs beams and columns etc. and making good the<br />
same to the desired finish as per specification, <strong>for</strong> the placement of electrical,<br />
intercommunication cables, conduits, air-conditioning inlets and outlets grills and other<br />
equipments etc. where required. For the above said requirements in the false ceiling and<br />
other partitions, the CONTRACTOR be<strong>for</strong>e starting-up the work shall in consultation with the<br />
Electrical, Mechanical, Intercommunication, Air-conditioning contractor and other agencies<br />
prepare and put-up a joint scheme, showing the necessary openings, grooves, recesses, cuts,<br />
the methods of fixing required <strong>for</strong> the WORK of the a<strong>for</strong>esaid, and the finishes therein, to the<br />
ENGINEER-IN-CHARGE and get the approval. The CONTRACTOR be<strong>for</strong>e finally submitting the<br />
scheme to the ENGINEER-IN-CHARGE, shall have the written agreement of the other<br />
agencies. The ENGINEER- IN-CHARGE, be<strong>for</strong>e communicating his approval to the scheme,<br />
with any required modification, shall get the final agreement of all the agencies, which shall<br />
be binding. No claim shall be entertained on account of the above. The CONTRACTOR shall<br />
confirm in all respects with provision of any statutory regulations, ordinances or byelaws of<br />
any local or duly constituted authorities or public bodies which may be applicable from time<br />
to time to the WORK or any temporary works. The CONTRACTOR shall keep the EMPLOYER<br />
indemnified against all penalties and liabilities of every kind, arising out of non- adherance to<br />
such stains, ordinances, laws, rules, regulations, etc.<br />
40 Other agencies at site:<br />
40.1 The CONTRACTOR shall have to execute the WORK in such place and conditions where other<br />
agencies will also be engaged <strong>for</strong> other works such as site grading, filling, and levelling,<br />
electrical and mechanical engineering works, etc. No claim shall be entertained due to WORK<br />
being executed in the above circumstances.<br />
41 Notice:<br />
41.1 TO THE CONTRACTOR: Any notice hereunder may be served on the CONTRACTOR or his<br />
duly authorised representative at the job site or may be served by registered mail direct to<br />
Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />
ARC <strong>for</strong> O&M <strong>Services</strong><br />