24.31 <strong>Contract</strong>or has to submit the following documents to EIC as per the<br />
schedule given below :<br />
i) Copy of wage register latest by 10th of every month showing<br />
disbursement in the presence of authorized representative of<br />
<strong>GAIL</strong> with certification (rule 73 of contract labour (R&A) Act<br />
1970 monthly.<br />
ii) Copy of PF challan along with statement of contract labour with<br />
breakup of contribution by 26th of every month.<br />
iii) Half yearly return under <strong>Contract</strong> Labour (R&A) Act 1970 within 30<br />
days from close of half year<br />
iv) Statement of disbursement of annual bonus<br />
v) ESI challan etc.<br />
24.32 <strong>Contract</strong>or has to submit PF no. , computerized ESI card and labour license<br />
within a maximum time period of THREE months from the date of LOA.<br />
25.0 SITE VISIT<br />
25.1 The contractor should visit the work site and familiarize himself about the<br />
equipments installed and magnitude of the job and should quote accordingly in the<br />
Price-Bid which shall be valid throughout the currency of the contract.<br />
26.0 TERMINATION OF CONTRACT<br />
26.1 Termination of <strong>Contract</strong> on Owner’s Initiative:<br />
<strong>GAIL</strong> reserves the right to terminate the <strong>Contract</strong> either in part or in full without<br />
assigning any reason there of. Officer shall in such an event give 30 days<br />
notice in writing to the <strong>Contract</strong>or of his decision to do so. <strong>Contract</strong>or upon receipt<br />
of such notice discontinue the work. In the event of such termination, <strong>Contract</strong>or<br />
shall be paid <strong>for</strong> the actual time per<strong>for</strong>med till the date specified in the notice.<br />
27.0 RESOLUTION OF DISPUTES/ARBITRATION<br />
27.1 All dispute, controversy, or claim between the parties which can not be mutually<br />
resolved within a reasonable time shall be referred to arbitration by Sole<br />
Arbitrator. The owner (<strong>GAIL</strong> (India) Ltd.) shall suggest a panel of three independent<br />
anddistinguished persons to the bidder/contractor/supplier/buyer (as the case<br />
may be) to select any one among them to act as the Sole Arbitrator. In the<br />
event of failure of the bidder to select the Sole Arbitrator within 30 days from the<br />
receipt of the communication suggesting the panel of arbitrators, the right of<br />
selection of the sole arbitrator by bidder shall stand <strong>for</strong>feited and the OWNER<br />
(<strong>GAIL</strong>) shall have discretion to proceed with the appointment of the Sole Arbitrator.<br />
The decision of owner on the appointment of the sole arbitrator shall be final<br />
and binding. The award of sole arbitrator shall be final and binding on the<br />
parties and unless directed/awarded otherwise the sole arbitrator, the cost of<br />
arbitration proceedings shall be shared equally by the parties. The Arbitration<br />
proceedings shall be in English language and venue shall be New Delhi, India.<br />
Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />
ARC <strong>for</strong> O&M <strong>Services</strong><br />
109