13.0. SITE UPKEEP<br />

13.1 The contractor shall take care <strong>for</strong> the upkeep of the working site from time<br />

to time <strong>for</strong> easy access to work site and also from safety point of view.<br />

13.2 Working site should be always kept neat & tidy up to the entire satisfactions of the<br />

EIC.<br />

14.0. ABNORMALLY HIGH UNIT RATES (AHR ITEMS)<br />

14.1 Clause no. 20.0 of GCC is modified to the following extent : In items rate contract<br />

where the quoted rates <strong>for</strong> the items exceed 50% of the owners/ estimated<br />

rates, such items will be considered as Abnormally High <strong>Rate</strong>s Items (AHR) and<br />

payment of AHR items beyond the SOR stipulated quantities shall be made<br />

at the least of the following rates:<br />

14.2 <strong>Rate</strong>s as per SOR, quoted by the contractor.<br />

14.3 <strong>Rate</strong> of the item, which shall be derived as follows :<br />

14.3.1 Based on rates of machine and labour as available from the contract (which includes<br />

contractor's supervision, profit, overheads and other expenses).<br />

14.4 In case rates are not available in the contract, rates will be calculated based on<br />

prevailing market rates of machine , material and labour plus 15% to<br />

cover contractor's supervision profit, overhead & other expenses.<br />

15.0 MOBILIZATION ADVANCE<br />

15.1 No Mobilization advance is payable to the contractor under this contract<br />

16.0. DEFECT LIABILITY PERIOD:<br />

NOT APPLICABLE .<br />

17.0. NO DAMAGE TO INSTALLATIONS & ADJACENT LAND<br />

17.1 <strong>Contract</strong>or shall ensure that during the progress of the work no damage shall occur<br />

to installations due to any reason, if so happens, contractor shall have to<br />

repair/replace the same at his own risk and cost. The decision of EIC shall be final<br />

and binding on the contractor in this case.<br />

18.0. DEFENSE OF WORK<br />

18.1 If any action in court brought against the owner or an officer or agent of the owner,<br />

<strong>for</strong> the failure, omission or neglect on the part of the contractor to per<strong>for</strong>m any acts,<br />

matters, convenient or things under the contract or injury caused by the<br />

alleged omission or negligence on the part of the contractor, his agent,<br />

representative or his sub-contractor or in connection with any claim based on<br />

Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />

ARC <strong>for</strong> O&M <strong>Services</strong><br />