13.0. SITE UPKEEP<br />
13.1 The contractor shall take care <strong>for</strong> the upkeep of the working site from time<br />
to time <strong>for</strong> easy access to work site and also from safety point of view.<br />
13.2 Working site should be always kept neat & tidy up to the entire satisfactions of the<br />
EIC.<br />
14.0. ABNORMALLY HIGH UNIT RATES (AHR ITEMS)<br />
14.1 Clause no. 20.0 of GCC is modified to the following extent : In items rate contract<br />
where the quoted rates <strong>for</strong> the items exceed 50% of the owners/ estimated<br />
rates, such items will be considered as Abnormally High <strong>Rate</strong>s Items (AHR) and<br />
payment of AHR items beyond the SOR stipulated quantities shall be made<br />
at the least of the following rates:<br />
14.2 <strong>Rate</strong>s as per SOR, quoted by the contractor.<br />
14.3 <strong>Rate</strong> of the item, which shall be derived as follows :<br />
14.3.1 Based on rates of machine and labour as available from the contract (which includes<br />
contractor's supervision, profit, overheads and other expenses).<br />
14.4 In case rates are not available in the contract, rates will be calculated based on<br />
prevailing market rates of machine , material and labour plus 15% to<br />
cover contractor's supervision profit, overhead & other expenses.<br />
15.0 MOBILIZATION ADVANCE<br />
15.1 No Mobilization advance is payable to the contractor under this contract<br />
16.0. DEFECT LIABILITY PERIOD:<br />
NOT APPLICABLE .<br />
17.0. NO DAMAGE TO INSTALLATIONS & ADJACENT LAND<br />
17.1 <strong>Contract</strong>or shall ensure that during the progress of the work no damage shall occur<br />
to installations due to any reason, if so happens, contractor shall have to<br />
repair/replace the same at his own risk and cost. The decision of EIC shall be final<br />
and binding on the contractor in this case.<br />
18.0. DEFENSE OF WORK<br />
18.1 If any action in court brought against the owner or an officer or agent of the owner,<br />
<strong>for</strong> the failure, omission or neglect on the part of the contractor to per<strong>for</strong>m any acts,<br />
matters, convenient or things under the contract or injury caused by the<br />
alleged omission or negligence on the part of the contractor, his agent,<br />
representative or his sub-contractor or in connection with any claim based on<br />
Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />
ARC <strong>for</strong> O&M <strong>Services</strong><br />
104