04.08.2013 Views

Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL

Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL

Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9.4 All charges such as wages and other statutory payments admissible to the<br />

contractor’s employees, should be considered while quoting the service<br />

charges.<br />

10.0. SCHEDULE OF RATE<br />

10.1 The schedule of rates (SOR) shall be read in conjunction with special conditions of<br />

contract, general conditions of contract, technical specifications, drawings and<br />

any other document <strong>for</strong>ming a part of this contract. The quantities shown against<br />

the various items are only approximate and subject to any variations as per<br />

the stipulation made in general conditions of contract.<br />

10.2 The owner reserves the right to interpolate or extrapolate the rates <strong>for</strong> any new item<br />

of work not covered in schedule of rates from the similar items already available in<br />

schedule of rates. All the works, item wise, shall be measured upon completion<br />

and paid <strong>for</strong> at the contracted rates. In case any activity though specifically<br />

not covered in schedule of rates description but the same is covered under<br />

scope of work/specification/drawings etc. No extra claim on this account shall be<br />

entertained, since SOR is to be read in conjunction with other documents <strong>for</strong>ming<br />

part of the contract.<br />

10.3 All items of work in the Schedule of <strong>Rate</strong>s shall be carried out as per the scope of<br />

work , drawings and instructions of the EIC or its authorized representative and the<br />

rates are inclusive of all consumables, labour, supervision, tools and tackles,<br />

incidental, intermediate/auxiliary/ancillary or enabling works.<br />

11.0 PHOTOGATEPASS / LABOUR PERMISSION / VEHICLE PERMISSION/<br />

SAFETY NORMS:<br />

11.1 The contractor shall arrange to make photo gate passes / labour permissions/<br />

vehicle passes etc. <strong>for</strong> his persons / labour / vehicles including police<br />

verification of its deployed personnel’s and follow all safety norms/procedures<br />

<strong>for</strong> working at site at his own cost and as per rules of the company<br />

12.0. ALTERATION, ADDITIONS AND OMISSIONS:<br />

12.1 <strong>GAIL</strong> may suggest any variation of quantity of the work or part thereof that may, in<br />

his opinion be necessary and <strong>for</strong> that purpose or if <strong>for</strong> any other reason it shall, in<br />

his opinion be desirable then <strong>GAIL</strong> shall have power to order in writing to the<br />

contractor to do any of the following:<br />

12.1.1 Increase or decrease in the quantity of any work included in the contract.<br />

12.1.2 Omit any such work or SOR item.<br />

12.1.3 Execute additional work of any kind necessary <strong>for</strong> the completion of the work<br />

Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />

ARC <strong>for</strong> O&M <strong>Services</strong><br />

103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!