whatsoever with the traffic on any roads or footpath at the site or in the vicinity<br />

thereto or any existing works whether the property of the Administration or of a third<br />

party. In addition to the above, the CONTRACTOR shall abide by the safety code<br />

provision as per C.P.W.D. Safety code and Indian Standard Safety Code from time to<br />

time.<br />

117 Care in handling inflammable gas:<br />

117.1 The CONTRACTOR has to ensure all precautionary measures and exercise utmost care in<br />

handling the inflammable gas cylinder/inflammable liquids/paints etc. as required under the<br />

law and/or as advised by the fire Authorities of the EMPLOYER.<br />

118 Temporary combustible structures:<br />

118.1 Temporary combustible structures will not be built near or around work site.<br />

119 Precautions against fire:<br />

119.1 The CONTRACTOR will have to provide Fire Extinguishers, Fire Buckets and drums at worksite<br />

as recommended by ENGINEER-IN-CHARGE. They will have to ensure all precautionary<br />

measures and exercise utmost care in handling the inflammable gas cylinders/ inflammable<br />

liquid/ paints etc. as advised by ENGINEER-IN-CHARGE. Temporary combustible structures<br />

will not be built near or around the work-site.<br />

120 Explosives:<br />

120.1 Explosives shall not be stored or used on the WORK or on the SITE by the CONTRACTOR<br />

without the permission of the ENGINEER-IN-CHARGE in writing and then only in the manner<br />

and to the extent to which such permission is given. When explosives are required <strong>for</strong> the<br />

WORK they will be stored in a special magazine to be provided at the cost of the<br />

CONTRACTOR in accordance with the Explosives Rules. The CONTRACTOR shall obtain the<br />

necessary licence <strong>for</strong> the storage and the use of explosives and all operations in which or <strong>for</strong><br />

which explosives are employed shall be at sole risk and responsibility of the CONTRACTOR<br />

and the CONTRACTOR shall indemnify the EMPLOYER against any loss or damage resulting<br />

directly or indirectly therefrom.<br />

121 Mines act:<br />

121.1 SAFETY CODE: The CONTRACTOR shall at his own expense arrange <strong>for</strong> the safety provisions<br />

as required by the ENGINEER-IN-CHARGE in respect of all labour directly employed <strong>for</strong><br />

per<strong>for</strong>mance of the WORKS and shall provide all facilities in connection therewith. In case the<br />

CONTRACTOR fails to make arrangements and provides necessary facilities as a<strong>for</strong>esaid, the<br />

ENGINEER-IN- CHARGE shall be entitled to do so and recover the costs thereof from the<br />

CONTRACTOR.<br />

121.2 Failure to comply with Safety Code or the provisions relating to report on accidents and to<br />

grant of maternity benefits to female workers shall make the CONTRACTOR liable to pay<br />

Company Liquidated Damages an amount not exceeding Rs.50/- <strong>for</strong> each default or<br />

materially incorrect statement. The decision of the ENGINEER-IN-CHARGE in such matters<br />

based on reports from the Inspecting Officer or from representatives of ENGINEER-IN-<br />

CHARGE shall be final and binding and deductions <strong>for</strong> recovery of such Liquidated Damages<br />

may be made from any amount payable to the CONTRACTOR from all the provisions of the<br />

Mines Act, 1952 or any statutory modifications or re-enactment thereof the time being in<br />

<strong>for</strong>ce and any Rules and Regulations made thereunder in respect of all the persons employed<br />

by him under this CONTRACT and shall indemnify the EMPLOYER from and against any claim<br />

88<br />

Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />

ARC <strong>for</strong> O&M <strong>Services</strong>