1.1.23 "APPROVED" shall mean approved in writing including subsequent written confirmation of<br />
previous verbal approval and "APPROVAL" means approval in writing including as a<strong>for</strong>esaid.<br />
1.1.24 "LETTER OF INTENT/FAX OF INTENT” shall mean intimation by a Fax/Letter to<br />
Tenderer(s) that the tender has been accepted in accordance with the provisions contained in<br />
the letter.<br />
1.1.25 "DAY" means a day of 24 hours from midnight to midnight irrespective of the number of<br />
hours worked in that day.<br />
1.1.26 "WORKING DAY" means any day which is not declared to be holiday or rest day by the<br />
EMPLOYER.<br />
1.1.27 "WEEK" means a period of any consecutive seven days.<br />
1.1.28 "METRIC SYSTEM" - All technical documents regarding the construction of works are given in<br />
the metric system and all work in the project should be carried out according to the metric<br />
system. All documents concerning the work shall also be maintained in the metric system.<br />
1.1.29 "VALUE OF CONTRACT” or “TOTAL CONTRACT PRICE” shall mean the sum accepted or the<br />
sum calculated in accordance with the prices accepted in tender and/or the CONTRACT rates<br />
as payable to the CONTRACTOR <strong>for</strong> the entire execution and full completion of the work,<br />
including change order.<br />
1.1.30 "LANGUAGE FOR DRAWINGS AND INSTRUCTION" All the drawings, titles, notes, instruction,<br />
dimensions, etc. shall be in English Language.<br />
1.1.31 "MOBILIZATION" shall mean establishment of sufficiently adequate infrastructure by the<br />
CONTRACTOR at "SITE" comprising of construction equipments, aids, tools tackles including<br />
setting of site offices with facilities such as power, water, communication etc. establishing<br />
manpower organisation comprising of Resident Engineers, Supervising personnel and an<br />
adequate strength of skilled, semi-skilled and un-skilled workers, who with the so established<br />
infrastructure shall be in a position to 3 commence execution of work at site(s), in accordance<br />
with the agreed Time Schedule of Completion of Work. "MOBILISATION" shall be considered<br />
to have been achieved, if the CONTRACTOR is able to establish infrastructure as per Time<br />
Schedule, where so warranted in accordance with agreed schedule of work implementation to<br />
the satisfaction of ENGINEER-IN-CHARGE/ EMPLOYER.<br />
1.1.32 "COMMISSIONING" shall mean pressing into service of the system including the plant(s),<br />
equipment(s), vessel(s), pipeline, machinery(ies), or any other section or sub-section of<br />
installation(s) pertaining to the work of the CONTRACTOR after successful testing and trial<br />
runs of the same. "COMMISSIONING" can be either <strong>for</strong> a completed system or a part of<br />
system of a combination of systems or sub-systems and can be per<strong>for</strong>med in any sequence<br />
as desired by EMPLOYER and in a manner established to be made suited according to<br />
availability of pre-requisites. Any such readjustments made by EMPLOYER in per<strong>for</strong>mance of<br />
"COMMISSIONING" activity will not be construed to be violating CONTRACT provisions and<br />
CONTRACTOR shall be deemed to have provided <strong>for</strong> the same.<br />
Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />
ARC <strong>for</strong> O&M <strong>Services</strong><br />
32