2.0 ORDER OF PRECEDENCE<br />
In the case of ambiguity in schedule of rates, Special Conditions of <strong>Contract</strong>, General<br />
Conditions of <strong>Contract</strong>, Scope of work etc., the following order of precedence will prevail:<br />
a) Fax of Intent / detailed Letter of Award alongwith statement of agreed variations and<br />
its enclosures and any corrigendum / addendum.<br />
b) Schedule of Quantities / rates alongwith the preamble.<br />
c) Special Conditions of <strong>Contract</strong><br />
d) Specifications, special notes to tenderers regarding specifications (if any) and<br />
drawings all in conjunction with each other. However in case of any variance<br />
in size, thickness / dimentions of members between drawings and specifications<br />
etc. then drawings shall prevail over specifications.<br />
e) General Conditions of <strong>Contract</strong>.<br />
3.0 Definitions<br />
3.1 The expression ‘Vendor / <strong>Contract</strong>or’ shall mean the bidder selected by the employer<br />
<strong>for</strong> the execution of the subject work and shall include the successors and permitted<br />
assigns of the Vendor.<br />
3.2 The ‘Engineer-in-Charge’ shall mean the Engineer-In-charge’ the <strong>GAIL</strong> <strong>for</strong> this project<br />
and shall include any person acting as in charge on his behalf.<br />
3.3 ‘Authorized Representative’ shall mean any Officer/Supervisor /consultant/ Staff of<br />
<strong>GAIL</strong> authorized by the Head of Department.<br />
3.4 Where any portion of the General conditions of <strong>Contract</strong> is repugnant to or at<br />
variance with any provision of special conditions of contract, the provision of<br />
Special Conditions of contract shall be deemed to over ride the provisions of<br />
General Condition of <strong>Contract</strong> and shall to the extent of such repugnancy of<br />
variation prevail.<br />
4.0 LOCATION OF WORK:<br />
4.1 The work is to be carried out at the places where services will be required are<br />
identified as work points. The total region has been divided into 10 (TEN)<br />
work points. Jurisdiction of various work points have been defined in Annexure .<br />
The actual site could be anywhere in TEN Work Points under <strong>NCR</strong> Gas O&M .<br />
4.2 The services will be provided based on the organizational requirement as assessed<br />
and identified from time to time.<br />
5.0 OWNER’S SCOPE OF SUPPLY:<br />
5.1 Major Tools & Tackles<br />
5.2 Consumables <strong>for</strong> doing day today maintenance jobs<br />
Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />
ARC <strong>for</strong> O&M <strong>Services</strong><br />