82 Guarantee/transfer of guarantee:<br />
82.1 For works like water-proofing, acid and alkali resisting materials, pre-construction soil<br />
treatment against termite or any other specialized works etc. the CONTRACTOR shall<br />
invariably engage SUB-CONTRACTORS who are specialists in the field and firms of repute and<br />
such a SUB-CONTRACTOR shall furnish guarantees <strong>for</strong> their workmanship to the EMPLOYER,<br />
through the CONTRACTOR. In case such a SUB-CONTRACTOR/ firm is not prepared to<br />
furnish a guarantee to the EMPLOYER, the CONTRACTOR shall give that guarantee to the<br />
EMPLOYER directly.<br />
83 Training of employer's personnel:<br />
83.1 The CONTRACTOR undertakes to provide training to Engineering personnel selected and sent<br />
by the EMPLOYER at the works of the CONTRACTOR without any cost to the EMPLOYER. The<br />
period and the nature of training <strong>for</strong> the individual personnel shall be agreed upon mutually<br />
between the CONTRACTOR and the EMPLOYER. These engineering personnel shall be given<br />
special training at the shops, where the equipment will be manufactured and/ or in their<br />
collaborator's works and where possible, in any other plant where equipment manufactured<br />
by the CONTRACTOR or his collaborators is under installation or test to enable those<br />
personnel to become familiar with the equipment being furnished by the CONTRACTOR.<br />
EMPLOYER shall bear only the to and fro fare of the said engineering personnel.<br />
84 Replacement of defective parts and materials:<br />
84.1 If during the progress of the WORK, EMPLOYER shall decide and in<strong>for</strong>m in writing to the<br />
CONTRACTOR, that the CONTRACTOR has manufactured any plant or part of the plant<br />
unsound or imperfect or has furnished plant inferior to the quality specified, the<br />
CONTRACTOR on receiving details of such defects or deficiencies shall at his own expenses<br />
within 7 (seven) days of his receiving the notice, or otherwise within such time as may be<br />
reasonably necessary <strong>for</strong> making it good, proceed to alter, re-construct or remove such work<br />
and furnish fresh equipments upto the standards of the specifications. In case the<br />
CONTRACTOR fails to do so, EMPLOYER may on giving the CONTRACTOR 7 (seven) day's<br />
notice in writing of his intentions to do so, proceed to remove the portion of the WORK so<br />
complained of and at the cost of CONTRACTOR's, per<strong>for</strong>m all such works or furnish all such<br />
equipments provided that nothing in the clause shall be deemed to deprive the EMPLOYER of<br />
or affect any rights under the CONTRACT, the EMPLOYER may otherwise have in respect of<br />
such defects and deficiencies.<br />
84.2 The CONTRACTOR's full and extreme liability under this clause shall be satisfied by the<br />
payments to the EMPLOYER of the extra cost, of such replacements procured including<br />
erection/installation as provided <strong>for</strong> in the CONTRACT; such extra cost being the ascertained<br />
difference between the price paid by the EMPLOYER <strong>for</strong> such replacements and the<br />
CONTRACT price portion <strong>for</strong> such defective plants and repayments of any sum paid by the<br />
EMPLOYER to the CONTRACTOR in respect of such defective plant. Should the EMPLOYER<br />
not so replace the defective plant the CONTRACTOR's extreme liability under this clause shall<br />
be limited to the repayment of all such sums paid by the EMPLOYER under the CONTRACT <strong>for</strong><br />
such defective plant.<br />
85 Indemnity<br />
85.1 If any action is brought be<strong>for</strong>e a Court, Tribunal or any other Authority against the Employer<br />
or an officer or agent of the EMPLOYER, <strong>for</strong> the failure, omission or neglect on the part of the<br />
CONTRACTOR to per<strong>for</strong>m any acts, matters, covenants or things under the CONTRACT, or<br />
damage or injury caused by the alleged omission or negligence on the part of the<br />