04.08.2013 Views

Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL

Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL

Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

13 Signing of the <strong>Contract</strong>:<br />

13.1 The successful tenderer shall be required to execute an AGREEMENT in the pro<strong>for</strong>ma<br />

attached with TENDER DOCUMENT within 15 days of the receipt by him of the Notification of<br />

Acceptance of Tender. In the event of failure on the part of the successful tenderer to sign<br />

the AGREEMENT within the above stipulated period, the Earnest Money or his initial deposit<br />

will be <strong>for</strong>efeited and the acceptance of the tender shall be considered as cancelled.<br />

14 Field Management & Controlling/Coordinating Authority:<br />

14.1 The field management will be the responsibility of the ENGINEER-IN-CHARGE, who will be<br />

nominated by the EMPLOYER. The ENGINEER-IN-CHARGE may also authorise his<br />

representatives to assist in per<strong>for</strong>ming his duties and functions.<br />

14.2 The ENGINEER-IN-CHARGE shall coordinate the works of various agencies engaged at site to<br />

ensure minimum disruption of work carried out by different agencies. It shall be the<br />

responsibility of the CONTRACTOR to plan and execute the work strictly in accordance with<br />

site instructions to avoid hindrance to the work being executed by other agencies.<br />

15 Note to Schedule of <strong>Rate</strong>s:<br />

15.1 The Schedule of <strong>Rate</strong>s should be read in conjunction with all the other sections of the tender.<br />

15.2 The tenderer shall be deemed to have studied the DRAWINGS, SPECIFICATIONS and details<br />

of work to be done within TIME SCHEDULE and to have aquainted himself of the condition<br />

prevailing at site.<br />

15.3 <strong>Rate</strong>s must be filled in the Schedule of <strong>Rate</strong>s of original Tender Documents. If quoted in<br />

separate typed sheets no variation in item description or specification shall be accepted. Any<br />

exceptions taken by the tenderer to the Schedule of <strong>Rate</strong>s shall be brought out in the terms<br />

and conditions of the offer.<br />

15.4 The quantities shown against the various items are only approximate. Any increase or<br />

decrease in the quantities shall not <strong>for</strong>m the basis of alteration of the rates quoted and<br />

accepted.<br />

15.5 The EMPLOYER reserves the right to interpolate the rates <strong>for</strong> such items of work falling<br />

between similar items of lower and higher magnitude.<br />

16 Policy <strong>for</strong> Tenders Under Consideration:<br />

16.1 Only Those Tenders which are complete in all respects and are strictly in accordance with the<br />

Terms and Conditions and Technical Specifications of Tender Document, shall be considered<br />

<strong>for</strong> evaluation. Such Tenders shall be deemed to be under consideration immediately after<br />

opening of Tender and until such time an official intimation of acceptance /rejection of<br />

Tender is made by <strong>GAIL</strong> to the Bidder.<br />

16.2 Zero Deviation: Bidders to note that this is a ZERO DEVIATION TENDER. <strong>GAIL</strong> will appreciate<br />

submission of offer based on the terms and conditions in the enclosed General Conditions of<br />

<strong>Contract</strong> (GCC), Special Conditions of <strong>Contract</strong> (SCC), Instructions to Bidders (ITB), Scope of<br />

Work, technical specifications etc. to avoid wastage of time and money in seeking<br />

clarifications on technical/ commercial aspects of the offer. Bidder may note that no technical<br />

and commercial clarifications will be sought <strong>for</strong> after the receipt of the bids. In case of any<br />

deviation/noncon<strong>for</strong>mity observed in the bid, it will be liable <strong>for</strong> rejection.<br />

40<br />

Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />

ARC <strong>for</strong> O&M <strong>Services</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!