Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL
Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL
Annual Rate Contract for O&M Services for NCR GAS O&M ... - GAIL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
25.2 A substantially responsive bid is one which con<strong>for</strong>ms to all the terms, conditions and<br />
specifications of the bidding documents without material deviations or reservations.<br />
A material deviation or reservation is one<br />
(a) that affects in any substantial way the scope, quality, or per<strong>for</strong>mance of the<br />
Works;<br />
(b) that limits in any substantial way, inconsistent with the bidding documents,<br />
the Employer’s rights or the bidder’s obligations under the contract; or<br />
(c) whose rectification would affect unfairly the competitive position of other<br />
bidders presenting substantially responsive bids.<br />
25.3 If a bid is not substantially responsive, it will be rejected by the Employer and may<br />
not subsequently be made responsive by correction or withdrawal of the<br />
noncon<strong>for</strong>ming deviation or reservation.<br />
26. Correction of Errors<br />
26.1 Bids determined to be substantially responsive will be checked by the Employer <strong>for</strong><br />
any arithmetic errors. Errors will be corrected by the Employer as follows:<br />
(a) Where there is a discrepancy between the amounts in words and in figures,<br />
the amount in words will govern; and<br />
(b) Where there is a discrepancy between the unit rate and the total resulting<br />
from multiplying the unit rate by the quantity, the unit rate<br />
as quoted will govern.<br />
26.2 The amount stated in the bid will be adjusted by the Employer in accordance with<br />
the above procedure <strong>for</strong> the correction of errors and, with the concurrence of the<br />
bidder, shall be considered as binding upon the bidder. If the bidder does not<br />
accept the corrected amount of bid, its bid will be rejected, and the bid security shall<br />
be <strong>for</strong>feited.<br />
27. Evaluation and comparison of prices of previously determined substantially<br />
responsive bids shall take into account stipulations given in Article 32.<br />
28. Evaluation and Comparison of Bids<br />
28.1 The evaluation and comparison of bids will be done as per the provisions of the<br />
bid evaluation criteria (to be separately along with bidding document against<br />
individual tenders).<br />
29 Domestic Bidder shall furnish details of equipment/ Items, applicable Central Sales<br />
Tax rate without Form-C along with the corresponding amount.<br />
30. The Sales Tax amount indicated by the Bidder as included in the prices shall be paid<br />
by <strong>GAIL</strong> against documentary evidence only. In case the Bidder is not able to<br />
produce documentary evidence <strong>for</strong> full value of the sales tax, the payment<br />
shall be limited to the value <strong>for</strong> which documentary evidence is furnished.<br />
Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />
ARC <strong>for</strong> O&M <strong>Services</strong><br />
26