25.2 A substantially responsive bid is one which con<strong>for</strong>ms to all the terms, conditions and<br />

specifications of the bidding documents without material deviations or reservations.<br />

A material deviation or reservation is one<br />

(a) that affects in any substantial way the scope, quality, or per<strong>for</strong>mance of the<br />

Works;<br />

(b) that limits in any substantial way, inconsistent with the bidding documents,<br />

the Employer’s rights or the bidder’s obligations under the contract; or<br />

(c) whose rectification would affect unfairly the competitive position of other<br />

bidders presenting substantially responsive bids.<br />

25.3 If a bid is not substantially responsive, it will be rejected by the Employer and may<br />

not subsequently be made responsive by correction or withdrawal of the<br />

noncon<strong>for</strong>ming deviation or reservation.<br />

26. Correction of Errors<br />

26.1 Bids determined to be substantially responsive will be checked by the Employer <strong>for</strong><br />

any arithmetic errors. Errors will be corrected by the Employer as follows:<br />

(a) Where there is a discrepancy between the amounts in words and in figures,<br />

the amount in words will govern; and<br />

(b) Where there is a discrepancy between the unit rate and the total resulting<br />

from multiplying the unit rate by the quantity, the unit rate<br />

as quoted will govern.<br />

26.2 The amount stated in the bid will be adjusted by the Employer in accordance with<br />

the above procedure <strong>for</strong> the correction of errors and, with the concurrence of the<br />

bidder, shall be considered as binding upon the bidder. If the bidder does not<br />

accept the corrected amount of bid, its bid will be rejected, and the bid security shall<br />

be <strong>for</strong>feited.<br />

27. Evaluation and comparison of prices of previously determined substantially<br />

responsive bids shall take into account stipulations given in Article 32.<br />

28. Evaluation and Comparison of Bids<br />

28.1 The evaluation and comparison of bids will be done as per the provisions of the<br />

bid evaluation criteria (to be separately along with bidding document against<br />

individual tenders).<br />

29 Domestic Bidder shall furnish details of equipment/ Items, applicable Central Sales<br />

Tax rate without Form-C along with the corresponding amount.<br />

30. The Sales Tax amount indicated by the Bidder as included in the prices shall be paid<br />

by <strong>GAIL</strong> against documentary evidence only. In case the Bidder is not able to<br />

produce documentary evidence <strong>for</strong> full value of the sales tax, the payment<br />

shall be limited to the value <strong>for</strong> which documentary evidence is furnished.<br />

Tender/Bid Document No: <strong>GAIL</strong>/<strong>NCR</strong>/C&P/6114<br />

ARC <strong>for</strong> O&M <strong>Services</strong><br />

26