06.08.2013 Views

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 22: Airweigh System Figure 23: Airweigh System<br />

(Trailer Suspension) (Trailer Suspension)<br />

Figure 24: Auto Air System Figure 25: Thermocouple in<br />

(Trailer Tires Only) Rear Differential<br />

Figure 26: Wheel Force Figure 27: Cable from Trailer<br />

Transducer (Drive Axle) Mounted Sensors to eDaq DAS<br />

3.3.5.2 De-instrumentation: Following the completion of pilot testing in mid-January, 2006, the test<br />

vehicle was de-instrumented at the Dana Tech. <strong>Center</strong> and all of the equipment owned or leased by<br />

ORNL was returned.<br />

3.3.6 Task 6: Test and Evaluate the Instrumented Tractor-Trailer (Collect Pilot Data).<br />

Pilot Testing was originally scheduled to have begun in early August, 2005. Because of various delays<br />

related to staff engineer availability, availability of equipment, and equipment calibration, pilot testing<br />

was not initiated until October 23, 2005. Because of this delay, and because of the need to expedite<br />