06.08.2013 Views

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Hardware Setup and Configuration. For all channel IDs, the “0” (as in<br />

“xxxx_0”) represents the DAS number.<br />

1) Select the Test ID / Network Setup window and click Edit ID.<br />

2) In the Title field, type the TCE setup file name.<br />

3) Fill in the name of the Operator.<br />

4) The Date field will automatically show the current date.<br />

NOTE: Whenever the Edit ID button is clicked, the date field will be<br />

updated to the current date. If necessary, this date may be<br />

changed by typing in the desired date.<br />

5) In the Comments field, type in a brief description of the test<br />

including the purpose of the test specific hardware/sensors used,<br />

and any other notes which may be helpful to future operators.<br />

Figure 7.2.3: Editing the Test ID<br />

6) When finished, click OK and save the test setup file (Ctrl+S).<br />

NOTE: Changes to the Test ID may be made at any time during the<br />

test setup. When finished with test setup, check/update the Test ID to<br />

verify the in<strong>for</strong>mation it contains is still relevant to the test.<br />

7.2.4. Transducer Channel Setup<br />

Note: This procedure is per<strong>for</strong>med following Hardware Setup and<br />

Configuration. While the eDAQ does not need to be connected to the<br />

computer <strong>for</strong> this step, the TCE software should be running and the<br />

appropriate setup file (with hardware already set up) should be open<br />

(File > Open).<br />

D-35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!