06.08.2013 Views

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 6.1: Fuse Panel in Volvo Dashboard<br />

6.2. Storage Container<br />

Place the eDAQ/VBOX container in the storage space on the left side of the<br />

truck as shown in Figure 6.2.<br />

Figure 6.2: <strong>Truck</strong> Cab Storage Space<br />

6.3. Weather Station<br />

Clamp ANSI ¾” tube to the driver’s side mirror. Attach the weather station to<br />

the top of the tube, with North pointing <strong>for</strong>ward. Cover the orange weather<br />

station cable with wire loom. Then run the cable down through the tube and<br />

under the body of the truck until it reaches the eDAQ. Use silicone and cable<br />

ties to hold the cable in place, taping over the silicone until it sets.<br />

D-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!