• Selection of a DAS that stores data in an easily extractable <strong>for</strong>mat<br />

• Time stamping is of critical importance <strong>for</strong> comparison of data<br />

• If data is <strong>for</strong> some reason not taken, an indicator should be provided saying that the data<br />

was missed (otherwise, data synchronization would be a problem).<br />

• Collection of data can be done at much less than 100Hz. A rate of 2-10Hz is sufficient.<br />

• The data collection rate should be the same <strong>for</strong> all per<strong>for</strong>mance measures.<br />

• Data handling and processing, especially with extremely large data sets can be extremely<br />

resource intensive.<br />

3.3.8 Task 8: Prepare Phase 1 <strong>Report</strong>.<br />

This final report was initiated after all of the pilot testing was completed, and prior to the completion<br />

of the data analyses. It reflects ef<strong>for</strong>ts in all of the nine HVDC Task areas.<br />

3.3.9 Task 9: Provide <strong>Project</strong> Management.<br />

ORNL’s <strong>Project</strong> Management ef<strong>for</strong>ts involved a number of significant activities. They included<br />

oversight of a multi-faceted team, planning and logistics, sponsor-partner interactions, fiscal<br />

management, interaction with 21 st Century <strong>Truck</strong> Partnership, and monthly reporting. Some of the<br />

major meetings that the HVDC <strong>Project</strong> Team was involved with included the following:<br />

• A presentation related to project status was provided at the Advanced Vehicle Technologies<br />

Analysis and Evaluation (AVTAE) project review meeting held at DOE-HQ on August 16,<br />

2005. At that meeting in<strong>for</strong>mation on the project was presented and was well received.<br />

• A project review meeting was held with Mr. Lee Slezak on Friday, December 2, 2005 in the<br />

Forrestal Building. <strong>Project</strong> status and FY2006 budget requests were reviewed. The FY06<br />

budget of was discussed and agreed upon to begin the Field Test portion of the project.<br />

• ORNL and Michelin staff met with Mr. Lee Slezak at DOE HQ on Thursday, January 25,<br />

2006 to discuss FY2006 ef<strong>for</strong>ts.<br />

4.0 PHASE 2 EFFORTS<br />

Phase 2 of the HVDC ef<strong>for</strong>t will involve field data collection on one or more fleets (from two-to-ten<br />

tractor trailers) of class-8 tractor trailers engaged in normal vocational/economic activities over a 12month<br />

period of time. A reduced set of data will be collected to focus on PSAT development and<br />

evaluation needs and data that compliment the needs of HVDC partners. Phase 2 of the HVDC<br />

<strong>Project</strong> will require 18 months of ef<strong>for</strong>t starting in April 2006, and being completed in September,<br />

2007. The field test will involve multiple long-haul runs across the US utilizing volunteer trucks<br />

from one or more private fleets.<br />

4.1 PHASE 2 TASKS<br />

Phase 2 ef<strong>for</strong>ts will be initiated in April 2005. The ef<strong>for</strong>t involves 13 tasks. These tasks are:<br />

A-27