06.08.2013 Views

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

Class-8 Heavy Truck Duty Cycle Project Final Report - Center for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.3.2 Per<strong>for</strong>mance Measures<br />

Fig. 18. Wiring Overview <strong>for</strong> FOT DAS<br />

A variety of metrics were identified as being necessary to support drive cycle and modeling needs<br />

pertaining to the test vehicles. The importance of the signal in supporting project objectives, cost,<br />

sensor survivability, and practicality of implementation were all considered in deriving the list of<br />

signals <strong>for</strong> the FOT, shown in Table 5.<br />

Table 5. FOT Measures of Per<strong>for</strong>mance and Associated Sensors<br />

Signal Sensor<br />

1 Instantaneous Fuel Economy J1939 Vehicle Data Bus<br />

2 Average Fuel Economy J1939 Vehicle Data Bus<br />

3 Fuel Rate J1939 Vehicle Data Bus<br />

4 Total Fuel Used J1939 Vehicle Data Bus<br />

5 Total Idle Fuel Used J1939 Vehicle Data Bus<br />

6 Current Gear J1939 Vehicle Data Bus<br />

7 Selected Gear J1939 Vehicle Data Bus<br />

8 Output Shaft Speed J1939 Vehicle Data Bus<br />

9 Actual Engine - Percent Torque J1939 Vehicle Data Bus<br />

10 Actual Gear Ratio J1939 Vehicle Data Bus<br />

24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!