6.5. Data Bus<br />

Run a single cable containing at least two twisted pairs of wires from the<br />

eDAQ, under the floorboard on the driver’s side, into the panel on the left of<br />

the driver’s pedals, behind the steering wheel, and into the fuse panel on the<br />

dashboard on the center-right of the truck. A wire coat hanger can be used to<br />

pull the cable through tight spaces. Check that the cable follows a path that<br />

will not be pinched when the steering wheel is tilted. Use one twisted pair <strong>for</strong><br />

the J1939 vehicle bus CAN High and Low connections, and another twisted<br />

pair <strong>for</strong> the Air-Weigh (J1708 CAN High and Low) connections.<br />

Figure 6.5: Installation of Cables <strong>for</strong> J1939 and J1708 Connections<br />

D-21