The on-road portion of the Pilot Testing took place from October 23, 2005 through January 19, 2006.<br />

This period of time included the holidays and involved considerable bad weather that caused some<br />

additional delays. The map in Fig. 15 shows the east-west route. The route traveling south is shown<br />

in Fig. 16, and the route traveling north is shown in Fig. 17. Each route was traveled twice (once<br />

with standard dual tires and once with NGSWBTs). It should be noted that the routes taken were not<br />

strictly identical, but were very similar.<br />

Table 4. HTDC Pilot Test Routes<br />

Route Name Interstate<br />

Estimated Days<br />

To Complete<br />

Kalamazoo MI-to-Portland OR I-80/I-84 5<br />

Portland OR-to-Kalamazoo MI I-84/I-80 5<br />

Kalamazoo MI-to-Bangor ME I-94, I-80 2<br />

Bangor ME-to-Miami FL I-95 6<br />

Naples FL-to-Detroit MI I-75 3<br />

Fig. 15. Pilot Test East-West Route<br />