13.11.2013 Views

Namibia PDNA 2009 - GFDRR

Namibia PDNA 2009 - GFDRR

Namibia PDNA 2009 - GFDRR

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 73: Early and medium and long term reconstruction needs<br />

Regions<br />

Type of<br />

Housing<br />

Early<br />

Recovery<br />

(N$<br />

million)<br />

Reconstruction<br />

as is<br />

(N$ million)<br />

Elevated Bases and<br />

Wet Proofing<br />

Build-back better<br />

(N$ million)<br />

Physical<br />

Barricades<br />

Relocation<br />

Total<br />

Central North modern 2.8 17.8 4.4 1.8 3.6 27.6<br />

informal 0.7 759.7 0 0.8 2.3<br />

North East<br />

traditional<br />

178.6 115.1 17.8 35.7 347.2<br />

11.0<br />

informal 1.0 0.7 0 1.0 2.7<br />

traditional 59.8 39.9 0 59.8 159.6<br />

Total 13.8 257.9 161.0 19.6 100.9 539.5<br />

Investments such as elevating bases, wet proofing houses, building physical barricades and relocating people living in the flood plains<br />

are not targeted in the housing section of NDP3. This would therefore be in addition to the planned investments.<br />

94<br />

<strong>Namibia</strong> POST-DISASTER NEEDS ASSESSMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!