13.11.2013 Views

Namibia PDNA 2009 - GFDRR

Namibia PDNA 2009 - GFDRR

Namibia PDNA 2009 - GFDRR

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Activities Key Outputs Time Frame Responsible Institution Supporting Institution<br />

19. Extension of services to proclaimed<br />

and non- proclaimed settlements<br />

Basic infrastructure for<br />

settlement in place<br />

October<br />

<strong>2009</strong>-October 2011<br />

MRLGH&RD Regional Councils and Local/<br />

Traditional Authorities<br />

OPM-DDRM<br />

MAWF, MOWT, MLR, NPC/<br />

MoF, <strong>Namibia</strong> Red Cross and UN<br />

Agencies<br />

20. Identification of available land for<br />

resettlement of flood-affected people<br />

Identified resettlement areas October <strong>2009</strong>- March<br />

2010<br />

Regional Councils & Local/<br />

Traditional Authorities<br />

MoLR and MRLGH&RD<br />

21. Encouragement and support of floodaffected<br />

people with permanent<br />

resettlement initiatives<br />

Permanent resettlement<br />

sites<br />

October <strong>2009</strong><br />

onwards<br />

Regional Councils & Local/<br />

Traditional Authorities<br />

MoLR and MRLGH&RD<br />

DDRM-OPM, <strong>Namibia</strong> Red Cross<br />

and UN agencies<br />

22. Enforcement of construction standards<br />

according to the South African Bureau<br />

of Standards (SABS) and adherence to<br />

the existing urban area master plans<br />

Infrastructure based on<br />

SABS standards and existing<br />

master plans<br />

October <strong>2009</strong><br />

onwards<br />

MRLGH&RD Regional Councils and Local/<br />

Traditional Authorities<br />

MoWT, NPC/MoF, <strong>Namibia</strong> Red<br />

Cross and UN agencies<br />

23. Encourage Traditional Authorities to<br />

pass by laws prohibiting construction in<br />

traditional water ways<br />

By laws prohibiting<br />

construction in traditional<br />

water ways in place<br />

October <strong>2009</strong>- March<br />

2010<br />

Traditional Authorities<br />

Regional Councils & Local/<br />

Authorities<br />

MRLGH&RD<br />

24. Expansion of sewage ponds and<br />

systems<br />

Adequate sewage system<br />

and capacity in case of flood<br />

emergencies<br />

October <strong>2009</strong><br />

onwards<br />

MRLGH&RD MoWT, NPC/MoF, UN Agencies,<br />

<strong>Namibia</strong> Red Cross<br />

25. Replicate usage of cost-effective<br />

construction materials and methods<br />

in flood-affected areas according to<br />

Habitat standards<br />

Cost effective materials<br />

identified and used<br />

Habitat standards replicated<br />

October <strong>2009</strong><br />

onwards<br />

MRLGH&RD MoWT, NPC/MoF, UN Agencies,<br />

<strong>Namibia</strong> Red Cross<br />

26. Execution of repairs and improvement<br />

of the existing road infrastructure<br />

Repaired and improved road<br />

infrastructure<br />

October <strong>2009</strong><br />

onwards<br />

MWT & Roads Authority Regional Councils and Local/<br />

Authorities<br />

Roads Construction Company<br />

(RCC)<br />

NPC/MoF, DDRM-OPM<br />

135

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!